Solar Installed on LA Shipping Warehouses

Thursday, January 21, 2010

PMA member Research Tool & Die Works, a shipbuilding industry manufacturers, has just installed a massive 225-kilowatt solar system on its facility in an industrial hub of shipping warehouses in Los Angeles. The company manufactures marine electrical hardware such as wireways.

Maritime Reporter September 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds


U.S. Investigators Head to Florida to Probe Ship Lost in Hurricane

Federal safety investigators traveled to Florida on Tuesday to investigate the U.S. container ship lost at sea after being hit by powerful Hurricane Joaquin, leaving

Northern Fleet to Conduct Anti-terrorist Exercises

The sailors of the Northern Fleet will conduct anti-terrorism exercises at Novaya Zemlya. During the exercise, the coast will be a landing. The landing will

US Orders EPA to Rewrite Ship Ballast Water Dumping Rules

A federal appeals court in New York ordered the government to rewrite its rules regulating the discharge of ballast water by ships, in a victory for environmental

Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Navigation Pipelines Port Authority Ship Simulators Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0815 sec (12 req/sec)