Southwest Pass Closes for Lee III Recovery

Monday, March 01, 2004
The U.S. Coast Guard was scheduled to close the Mississippi River's Southwest Pass for approximately eight to 10 hours on February 29, for recovery and salvage of the Lee III. A safety zone spanning the entire width and length of the pass will be enforced. The crane barges Lilli Bisso and Cappy Bisso are scheduled to lift the Lee III onto a deck barge and gently lift it to the surface where operations to remove the remaining fuel will commence. Pollution response teams will be on scene to prevent any pollution from entering the water. Once the Lee III is secured, on-scene personnel plan to search the vessel for any remaining crewmembers missing since Feb. 21.
Maritime Reporter August 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Casualties

USCG in Search of Missing Man in Lake Michigan

The Coast Guard is searching for a man who went missing on Lake Michigan, Tuesday. Missing is 48-year-old Joseph Kiehm from Milwaukee. Kiehm was last seen aboard his 26-foot white sailboat,

S. Korea Navy Chief Quizzed About Salvage Ship Absence

The state audit agency has interrogated the chief of the Navy over a faulty Navy salvage ship that failed to participate in the national rescue operation for the

Arctic Wreck Found after 169 Years

After more than 169 years, Canadian researchers discovered one of the two ships from the doomed Arctic expedition of Sir John Franklin, cracking one of the largest mysteries in sea exploration.

 
 
Maritime Security Maritime Standards Navigation Pipelines Salvage Ship Electronics Ship Repair Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1304 sec (8 req/sec)