St. Lawrence Seaway Releases 2004 Draft Details

Monday, March 01, 2004
The Great Lakes-St. Lawrence Seaway System issued a Notice establishing allowable drafts for the 2004 navigation season. In the Welland Canal, a maximum draft of 80.8 dm (26’6”) will be in effect for inland vessels and for ocean vessels equipped with bow thrusters. For ocean vessels not equipped with bow thrusters, the maximum draft will be 80.0 dm (26’3”). In the Montreal/Lake Ontario section, the maximum draft will be 79.2 dm (26’0”) until the South Shore Canal is ice-free or April 15, whichever occurs first, when the maximum draft will be increased to 80dm (26’3”). Seaway Notice No. 2 – 2004 (HK Law)
Maritime Reporter September 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Navigation

Sunken Barge Salvage Stops Traffic on Chicago River

The U.S. Coast Guard said it is restricting vessel traffic on the Chicago River to allow for salvage of a sunken barge. All cargo has been removed from the sunken

Maritime Reporter @ 75: The Daily Cartoon

Maritime Reporter & Engineering News was founded by John J. O'Malley (1905-1980) in 1939, and today ranks as the world's largest audited trade publication in the world serving the maritime industry,

Long Beach Port Honors OOCL Executive

Andrew Tung, CEO and Managing Director of Orient Overseas Container Line, was presented today with the prestigious “Port Pilot Award” by the Long Beach Board of Harbor Commissioners.

Finance

Wärtsilä Expects 5% Sales Growth

Wärtsilä announced its third quarter results, reporting that it sees good development in order intake and profitability. According to Wärtsilä, third quarter

Yara Reports Strong 3Q Results

Yara International ASA delivered strong third-quarter results, with record fertilizer deliveries and continued margin benefit from lower European gas price. "Yara

Lerwick Port Awards £16.5 mi Expansion Contract

Lerwick Port Authority has awarded a construction contract for the latest expansion of the harbour’s facilities in a project costing a total of £16.5 million

 
 
Maritime Careers / Shipboard Positions Maritime Security Naval Architecture Offshore Oil Pipelines Port Authority Salvage Ship Electronics Ship Repair Ship Simulators
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1006 sec (10 req/sec)