Statoil Fast Tracks Projects

Tuesday, March 16, 2010
Katla, one of the four projects to be given fast-track status, will be developed as a satellite of Oseberg Sør. (Photo: Helge Hansen)

“Our ambition on certain fields on the Norwegian continental shelf is to halve the time from discovery to production,” said Ståle Tungesvik, head of reserves and business development in Statoil.

Speeding up the development time is an important way of realizing Statoil’s objective of maintaining oil and gas production on the Norwegian continental shelf at the current level.  Three of four discoveries made since 2007 have been classified as small. Nine out of ten development candidates are likely to be developed with one seabed template and several wells.

“If we are going to be able to realize profitable developments such projects demand a different approach to that on major fields. By rationalizing time and resources and by using standard equipment, Statoil will reduce the norm time for simple developments from about five to two and a half years,” said Tungesvik.

The goal is to reduce development costs for the projects in question by 20-40% compared with current levels. Statoil has identified four projects to be given fast-track status. The four projects contain recoverable reserves that have been estimated at more than 140 million boe.

•    Katla – to be developed as a satellite of Oseberg Sør. Expected production start-up at the end of 2012.
•    Vigdis Nordøst – to be developed as a satellite of Snorre. Expected production start-up in 2012.
•    Gygrid – to be developed as a satellite of Draugen or Njord. Expected production start-up in 2012/2013.
•    Pan/ Pandora – to be developed as a satellite of Visund or Gullfaks. Expected production start-up in 2012.

The new methodology involves a greater degree of standardisation in the way the company develops fields and Statoil will now establish a catalogue listing the standard equipment to be used.

Maritime Reporter October 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds


The Future of Well Intervention

Herrenknecht and Ulstein are due to present their vision of the future of heavy well intervention at the Offshore Energy 2015 exhibition in Amsterdam this week.

USCG, RCAF to Conduct Joint Training

The crew of Coast Guard Air Station Traverse City is hosting an international joint search-and-rescue exercise with members of the Royal Canadian Air Force beginning

Ocean Installer in BP frame deal

Ocean Installer has been awarded a Regional Framework Agreement with BP for subsea work in the Gulf of Mexico region.   The agreement covers subsea fabrication,

Maritime Careers / Shipboard Positions Maritime Security Maritime Standards Naval Architecture Navigation Pod Propulsion Ship Simulators Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.2119 sec (5 req/sec)