Statoil Fast Tracks Projects

Tuesday, March 16, 2010
Katla, one of the four projects to be given fast-track status, will be developed as a satellite of Oseberg Sør. (Photo: Helge Hansen)

“Our ambition on certain fields on the Norwegian continental shelf is to halve the time from discovery to production,” said Ståle Tungesvik, head of reserves and business development in Statoil.

Speeding up the development time is an important way of realizing Statoil’s objective of maintaining oil and gas production on the Norwegian continental shelf at the current level.  Three of four discoveries made since 2007 have been classified as small. Nine out of ten development candidates are likely to be developed with one seabed template and several wells.

“If we are going to be able to realize profitable developments such projects demand a different approach to that on major fields. By rationalizing time and resources and by using standard equipment, Statoil will reduce the norm time for simple developments from about five to two and a half years,” said Tungesvik.

The goal is to reduce development costs for the projects in question by 20-40% compared with current levels. Statoil has identified four projects to be given fast-track status. The four projects contain recoverable reserves that have been estimated at more than 140 million boe.

•    Katla – to be developed as a satellite of Oseberg Sør. Expected production start-up at the end of 2012.
•    Vigdis Nordøst – to be developed as a satellite of Snorre. Expected production start-up in 2012.
•    Gygrid – to be developed as a satellite of Draugen or Njord. Expected production start-up in 2012/2013.
•    Pan/ Pandora – to be developed as a satellite of Visund or Gullfaks. Expected production start-up in 2012.

The new methodology involves a greater degree of standardisation in the way the company develops fields and Statoil will now establish a catalogue listing the standard equipment to be used.
 

Maritime Reporter July 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Offshore

CWind Joins National Workboat Association

Citing crew transfer services as an integral part of its offering, offshore wind industry service provider CWind announced it is now a member of the National Workboat Association (NWA) of the U.

BG Group Starts up Sixth FPSO in the Santos Basin

BG Group announced first oil from the Cidade de Itaguaí floating, production, storage and offloading (FPSO) vessel, the sixth unit to start production across the

BG Awards Fugro MBES, Seabed Coring Contract

Fugro has been awarded a contract by BG International Limited Sucursal Honduras to conduct an integrated multibeam echosounder (MBES) survey and seabed coring campaign

 
 
Maritime Contracts Maritime Security Maritime Standards Navigation Offshore Oil Pipelines Salvage Ship Electronics Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1235 sec (8 req/sec)