Status Update: Northeast Gateway

Monday, October 24, 2005
On October 18, 2005, a public scoping meeting was held in Boston, Massachusetts to discuss the proposed Northeast Gateway Deepwater Port project. The purpose of the meeting was to accept the public’s comments regarding the proposed project. The meeting took place from 6 p.m. to 8 p.m. in Faneuil Hall and was preceded by an informational open house from 4:30 p.m. to 6 p.m. A similar public scoping meeting and open house for the Northeast Gateway project took place in Gloucester, Massachusetts on October 19, 2005.
Maritime Reporter September 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Environmental

Study Shows Oceans Arrived Early to Earth

Earth is known as the Blue Planet because of its oceans, which cover more than 70 percent of the planet's surface and are home to the world's greatest diversity of life.

Two Great Lakes Toxic Hotspots Restored

EPA announces removal of two toxic hotspots on Lake Superior and Lake Michigan from binational list The U.S. Environmental Protection Agency today announced that two U.

CMA CGM to Retrofit 10 More Bulbous Bows

The CMA CGM Group said it will retrofit 10 of its vessels’ bulbous bows to achieve improved energy efficiency for slow steaming. The modifications are in addition

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Naval Architecture Offshore Oil Pod Propulsion Salvage Ship Repair Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1114 sec (9 req/sec)