Status Update: Northeast Gateway

Monday, October 24, 2005
On October 18, 2005, a public scoping meeting was held in Boston, Massachusetts to discuss the proposed Northeast Gateway Deepwater Port project. The purpose of the meeting was to accept the public’s comments regarding the proposed project. The meeting took place from 6 p.m. to 8 p.m. in Faneuil Hall and was preceded by an informational open house from 4:30 p.m. to 6 p.m. A similar public scoping meeting and open house for the Northeast Gateway project took place in Gloucester, Massachusetts on October 19, 2005.
Maritime Reporter September 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds


Hunt for Missing El Faro Ship Enters 4th day, Hopes Fade

Search and rescue teams resumed scouring the seas on Monday for the missing cargo ship El Faro and it mostly American crew, after it was caught in the eye of Hurricane Joaquin four days ago, the U.

USCG: Missing Cargo Ship El Faro Believed to Have Sunk

The U.S. Coast Guard now believes that the missing cargo ship El Faro sank after sailing into the path of Hurricane Joaquin in the Bahamas, a spokesman said on Monday.

Choi-Wan to hit SE Japan

Tropical Storm Choi-Wan, located near 21N/158E yesterday (4 October), is forecast to move WNW-NNW over the next days and intensify to a very large typhoon. A large area of HIGH to VERY HIGH sea,

Maritime Security Naval Architecture Navigation Pipelines Pod Propulsion Salvage Ship Electronics Ship Simulators Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1056 sec (9 req/sec)