Steiner Delivers Fourth Z-Drive Pushboat

Thursday, September 17, 2009
Photo courtesy Steiner Shipyard

The final, for now, delivery in a series of four 120 by 34-ft 3200-HP Z-drive towboats was completed at Steiner Shipyard in Alabama. The innovative vessels were built for Southern Towing of Memphis Tennessee.

As with the other three vessels the Arne Christiansen is powered by a pair of Tier 2 compliant Cummins QSK50 mains, each rated for 1,600 HP at 1800 RPM provides the power. The two engines are mounted aft on the main deck level. They turn short four-foot shafts to HRP Z-drives carrying 74.8-inch (1900 m/m) propellers in steerable nozzles.
 
The use of steerable nozzles in the Edward Shearer designed vessels was a significant departure for Mississippi pushboat design. Kenny Williams, pilot on the David Stegbauer delivered in December 2008, Kenny explained some  of the advantages in the Z-drive boats handling while steering around the big bends up-bound on the river from New Orleans. With a rudder boat I would be putting on 40 to 45 degrees of rudder on both sides, but with the Z-drive I only put about 20 degrees on the drive that is on the inside of the turn while the other drive pushes ahead.
 
When steering down river with loaded barges he said, With a rudder boat the biggest danger in flanking a bend is losing your stern to the current: with a Z-drive you can just turn it back in.
 
Southerns President William (Bill) Stegbauer says of the design of the firms Z-drive tugs, We built the last boat the same as the first one. They have exceeded our expectations on fuel economy and pushing power. Down bound, they can push around bends that a conventional boat would have to flank and lining up for locks and bridges is much easier so contributes to shortened trips which is good for our customers. We have been operating the first one for a year now and have had no prop damage.
 
There is little doubt that the Arne Christiansen and the other three vessels from Steiner will continue to attract interest on the Mississippi River system.

Maritime Reporter February 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Workboats

Mariner Medevaced in Alaska

An ailing mariner was medevaced from a fishing vessel in Beaver Inlet, approximately 13 miles southeast of Dutch Harbor, Sunday, the U.S. Coast Guard reported.   The

Editorial: Gettin’ Crabby with Deadliest Catch

As February is our traditional cruise shipping edition, naturally we’ve selected a fishing boat and two crabs for the cover. But as many of you may already know,

Haven Marine Bags Back To Back Dockings

Despite a slow start to the year, Haven Marine Services reports it is now seeing a change in fortunes with two dockings for Svitzer in quick succession, with one

 
 
Maritime Careers / Shipboard Positions Maritime Security Maritime Standards Navigation Pipelines Salvage Ship Electronics Ship Simulators Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.2629 sec (4 req/sec)