Stennis Security Completes Force Protection Exercise

Thursday, September 28, 2006
Sailors from USS John C. Stennis’ Strike Group (CVN 74) completed their Force Protection Exercise (FPEX) while in port in San Diego, Sept. 20. The exercise was designed to test the ship’s security and was one of the final tests before Stennis is declared ready for deployment.

“FPEX is an essential milestone in the preparation for our upcoming deployment,” said Capt. Brad E. Johanson, Stennis’ commanding officer. Stennis blew through the exercise, once again scoring among the top of all aircraft carriers in the fleet. “It was the best score they’d seen in [more than] two years,” said Lt. Brett Gunderson, Stennis’ security officer, referring to the Force Protection Certification Team. Used to measure how well an aircraft carrier can protect itself, FPEX measured Stennis’ ability to handle events such as bomb threats, boat attacks, chemical, biological and radioactive attacks, spies and operational security (OPSEC). The tactics Stennis were evaluated on will become critical when the ship is abroad during its upcoming deployment. One scenario included an explosion on the pier next to the ship. After the explosion, there were several victims who needed medical attention. The victims included two actual amputees who smeared fake blood on themselves to make the exercise seem more real. “We heard the explosion and starting running toward the people,” said Operation’s Specialist 2nd Class William Alleman from the security department. “When we saw the amputees, it made [the scenario] seem so real, I forgot we were doing a drill.”

The amputees were actually wounded during Operation Enduring Freedom while serving in the U.S. Army, and volunteered their time for the exercise. Though FPEX is geared to test Stennis’ security, it was an all-hands exercise that included substantial efforts from engineering, supply, reactor, air, operations, combat systems, weapons and deck departments. “There is no way we would have been this successful without the combined efforts of all the departments onboard Stennis,” said Gunderson. Thirty-five force protection officers watched overall facets of the exercise that led Stennis through another successful test.

This successful evaluation continues to demonstrate Stennis’ readiness as the crew prepares for deployment. The ship is currently underway off the coast of Southern California conducting operations with its entire strike group for the first time in nearly two years.

By Mass Communication Specialist 3rd Class (AW) Ron Reeves, USS John C. Stennis Public Affairs

Maritime Reporter June 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Navy

Cause of S.Korea Ferry Businessman's Death Remains Unknown

Yoo's body too badly decomposed to determine cause of death; mystery surrounding final days of de-factor owner of doomed ferry deepens. Yoo's son arrested in latest capture of family members.

DoD Awards Ingalls 'USS Ronald Reagan' Contract Modification

U.S. Department of Defense (DoD) informs that Huntington Ingalls Inc., Newport News, Virginia, is being awarded a US$13,759,894 modification to previously awarded cost-plus-award-fee,

House Subcommittee Hearing Highlights “Dismal State” of U.S. Icebreaking Capability

At the July 23, 2014, hearing of the House Subcommittee on Coast Guard and Maritime Transportation on “Implementing U.S. Policy in the Arctic” the committee chairman, Rep.

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Standards Pipelines Pod Propulsion Port Authority Salvage Ship Electronics Ship Repair Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1104 sec (9 req/sec)