Subcommittee Calls Public Hearing on LCS

Friday, February 09, 2007
The Navy’s ship for future sea warfare has become so problematic a congressional subcommittee has called a public hearing to get immediate answers. The Seapower and Expeditionary Forces Subcommittee will hear from those responsible for the Littoral Combat Ship program.

In recent weeks, the program to build a fast, flexible and lightly manned warship has been beset with issues. Its advertised price of $220 million per hull rose dramatically to estimates toward $400 million a piece.

The Navy wants 55 of the frigate-sized, shallow draft ships, making it a cornerstone of the future fleet. It’s designed to operate close to shore with a ship’s crew of just 40 sailors and a mission crew and air detachment of 35. But due to concerns about the program, Navy Secretary Donald Winter issued a stop-work order Jan. 12 on the third ship now in production, the single-hull Lockheed-Martin version.

A competing design, a tri-hull ship from General Dynamics, is not affected by the stop-work order. Rep. Gene Taylor, D-Miss., chairs the subcommittee that will be making inquiries today. Called to appear before the lawmakers are those responsible: Dolores Etter, assistant Navy secretary for research, development and acquisition; Vice Adm. Paul Sullivan, commander of Naval Sea Systems Command; Rear Adm. Charles Hamilton, Program Executive Officer for Ships; and Rear Adm. Barry McCullough, the director of Surface Warfare. Also appearing today will be the Fred Moosally, president of Lockheed Martin Marine Systems, and executives from Gibbs & Cox Naval Architects, Marinette Martin Shipyard and Bollinger Shipyards. Source: Navy Times

Maritime Reporter August 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

Ingalls Authenticates Keel on Aegis Destroyer

Huntington Ingalls Industries' (HII) Ingalls Shipbuilding division today authenticated the keel for the company's 30th Aegis guided missile destroyer, Ralph Johnson (DDG 114).

Steel Cut on First of Three ISVs for KT Maritime

A steel cutting ceremony held last week at the Singapore shipyard of partner company, ASL Shipyard Pte Ltd. marked the start of construction for the first of three

Two More Damen Twin Axe Catamarans for SeaZip

Damen Shipyards and SeaZip Offshore Service signed another contract for two Damen Fast Crew Suppliers (FCS) 2610 at Wind Energy in Hamburg. The two new vessels,

 
 
Maritime Careers / Shipboard Positions Maritime Security Maritime Standards Naval Architecture Navigation Pod Propulsion Salvage Ship Electronics Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1788 sec (6 req/sec)