Submarine Comes Together at Northrop Grumman

Thursday, September 14, 2006
Northrop Grumman reached a construction milestone on August 31 when it completed the final hull welds of the Virginia-class submarine North Carolina (SSN 777). This accomplishment, known as “pressure hull complete,” signifies the hull sections being joined to form a single unit. It is the last major milestone before the ship’s christening next spring.

“This is a giant step on the path to deliver North Carolina,” said Becky Stewart, vice president of the submarine program for Northrop Grumman’s Newport News sector. “She’s starting to come together and look like a submarine now, which is a testament to our shipbuilders and their commitment to not only producing a high-quality product, but to their tireless efforts to improve processes and results along the way.” Northrop Grumman is building North Carolina, the fourth ship of the Virginia-class, using lessons learned from the previous three ships of the class. It is currently 76 percent complete and is on track to deliver in February 2008.

Many of the 1,000 Newport News employees building the Virginia-class submarines signed a special banner to mark the occasion. Northrop Grumman is teamed with General Dynamics Electric Boat to build the first 10 ships of the Virginia class. Current plans call for 30 Virginia-class submarines in the fleet. Designed to meet the Navy’s requirements in a post-Cold War security environment, the submarines use advanced technologies to increase firepower, maneuverability and stealth. The 377-ft. long submarines are capable of submerged speeds of more than 25 knots and can stay submerged for months at a time. The keel for North Carolina was laid on May 22, 2004. Upon delivery to the Navy in early 2008, it will be the most modern and sophisticated attack submarine in the world, providing undersea supremacy well into the 21st century.

Maritime Reporter July 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

VT Halter to Build Bouchard ATB Tugs

VT Halter Marine, Inc., a subsidiary of Vision Technologies Systems, Inc. (VT Systems), today announced new contracts to build two 130-foot Articulated Tug Barge

Del Mar Signs Agency Agreement with Ciramar

Del Mar Marine Corp. announced it has signed an agency agreement with Ciramar Shipyards allowing the company to promote Ciramar Shipyard´s docking and facilities

Bouchard Orders Two Newbuild ATB Tugs

Morton S. Bouchard III, President and CEO of Bouchard Transportation Co., Inc., today announced the next step in Bouchard Transportation Co., Inc.’s ongoing fleet

Container Ships

Asia-N.Europe Container Freight Rates Jump 21%

Shipping freight rates for transporting containers from ports in Asia to Northern Europe jumped 21 percent to $1,455 per 20-foot container (TEU) in the week ended on Friday,

Matson Reports Solid Q2 2014 Results, Dividend Increased

Leading U.S. carrier in the PacificMatson, Inc. reported net income of $18.1 million or $0.42 per diluted share for the quarter ended June 30, 2014, compared with $20.

Redwood City Sees Cargo Movement Boost

Port of Redwood City reports 19% increase in cargo movement; highest since 2006 and third highest in modern history Reflecting a significant increase in construction

 
 
Maritime Careers / Shipboard Positions Maritime Standards Naval Architecture Offshore Oil Pipelines Pod Propulsion Ship Repair Ship Simulators Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1196 sec (8 req/sec)