Technip USA Announces Contract Award for the Freeport LNG Terminal

Tuesday, August 12, 2003
Freeport LNG Development, L.P. and Technip USA Corporation, a subsidiary of Technip have signed a contract for the Front End Engineering Design (FEED) leading to the finalization of the EPC (engineering, procurement and construction) contract for its LNG receiving terminal to be located on Quintana Island near Freeport, Texas. The FEED is expected to be completed by the end of December with the EPC phase of the project beginning in the first quarter of 2004. Michael Smith, CEO of Freeport LNG Development, L.P., said, "Technip has considerable experience in LNG facility design and this contract continues the relationship established with Technip during their assistance in the preparation of the FERC filing documents for our terminal. The need for LNG receiving facilities is a critical factor in meeting US energy needs. We filed with FERC for our terminal earlier this year and are receiving positive feedback on our application. The contract with Technip USA is a milestone in the further development of our terminal as we target its completion by 2007." Larry Pope, CEO of Technip USA Corporation based in Houston, Texas said, "Technip USA is very pleased to be part of this important project. We look forward to working with Freeport LNG in helping the nation meet our natural gas supply needs. This project, executed from Technip USA's offices in Houston, Texas, represents a continuation of Technip's forty-five year history in the global LNG industry and reinforces Technip USA Corporation's position as a major provider of expertise for LNG receiving terminals in the U.S. and elsewhere in the Americas." Smith further commented, "We plan to have facilities in place which will allow suppliers the ability to bring up to 1.5 billion cubic feet per day of gas into the country through this strategic Gulf Coast location. The natural gas will be transported through a 9.4 mile pipeline extending to Stratton Ridge, which is a major point of interconnection for a number of Texas intrastate pipeline systems. The proposed LNG marine terminal, storage, vaporization units, and natural gas pipeline will be located entirely in Brazoria County, Texas."
Maritime Reporter August 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

RYDLYME Marine Selects GoM Distributor

RYDLYME Marine has named R Carter & Associates, Inc. of Mobile, Ala. a new stocking distributor for the Gulf of Mexico area, targeting shipyards, larger workboats,

MN 100: Elliott Bay Design Group

The Company: Elliott Bay Design Group (EBDG) is a Seattle-based, employee-owned enterprise with offices in New Orleans and Ketchikan that provides full-service naval architecture,

MN 100: Dometic Marine

The Company: Dometic Marine is an engineering leader of innovative products for the global marine industry and offers a large worldwide sales and service network.

LNG

Hanjin Rolls Out First Philippine-made LPG carrier

Hanjin Heavy Industries and Construction Philippines (HHIC-Phil), which operates the world's fourth shipbuilding facility in Subic Freeport Zone, unveiled the

Egypt Picks Jordan LNG Cargo Winners

Egypt has picked Shell, Vitol and Trafigura in a tender to supply four cargoes of liquefied natural gas (LNG) via Jordan's Aqaba import terminal, trade sources said.

LNG-fueled Box Ship a 'Momentous Step Forward'

On Saturday, August 29, 2015, the world’s first series of energy efficient containerships welcomed its second LNG-powered vessel in San Diego, fueling the U.S.

 
 
Maritime Security Maritime Standards Naval Architecture Pipelines Pod Propulsion Port Authority Salvage Ship Simulators Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1651 sec (6 req/sec)