The Prins der Nederlanden Launched

Tuesday, August 26, 2003
Hardinxveld-Giessendam/Papendrecht - At 6 p.m. today, Her Majesty the Queen of The Netherlands will perform the naming and launching ceremony for the trailing suction hopper dredger ‘Prins der Nederlanden’. This dredging vessel is being built by Merwede Shipyard in Hardinxveld-Giessendam, acting on instructions from the British subsidiary of Royal Boskalis Westminster nv. The ‘Prins der Nederlanden’ is one of two new hopper dredgers currently being built for Boskalis. Both ships will be 156 meters long, with a hopper capacity of approximately 16,000 m³. The ships were specially designed for the dredging and transportation of sand and sludge. They will be used by Boskalis throughout the world on dredging projects such as land reclamation and harbor construction. The construction of the two ships is part of the long-term plans for the Boskalis fleet. Some of the plans for the fleet include increasing capacity in the light of market developments, others the replacement of older tonnage by highly efficient, state-of-the-art ships. For example, in November 2000, the mid-size hopper 'Coastway' (4,900 m³) was launched and 2002 saw the extension of the jumbohopper 'WD Fairway' to a megahopper of 35,500 m³. The ‘Prins der Nederlanden’ and her sister ship will be the cost leaders in their class. The ‘Prins der Nederlanden’ will go into service in February 2004. The second ship will follow later that year.
Maritime Reporter February 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Technology

Sunken Japanese WWII Battleship Found

Seventy years after the conclusion of World War II, philanthropist and entrepreneur Paul G. Allen has located the Musashi, one of the two largest and most technologically

ThyssenKrupp Says Submarines Part of Growth Story

Germany's Thyssenkrupp sees its submarine business as making an important contribution to its growth targets, the head of its Industrial Solutions business area said on Tuesday.

Added Value Innovation Drives Control of BWTS

Specifying for ballast water treatment systems can be a difficult process. Ian Hamilton, sales manager for marine electrical wiring control and instrumentation specialists CMR Group, offers guidance.

 
 
Maritime Careers / Shipboard Positions Maritime Security Pipelines Pod Propulsion Port Authority Ship Repair Ship Simulators Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1329 sec (8 req/sec)