Titan Refloats Ferry Arcangel

Thursday, July 03, 2008

Titan Salvage has srefloated a ferry, once grounded in a lagoon just north of and redelivered to its owners.  The Arcangel, a 350-ft. ferry that was no longer in service, was docked at Puerto Morelos when it was blown about a half-mile off its mooring during a severe winter storm in November 2007.  A 10-man team, which included Titan salvage specialists and local Mexican labor, were contracted and began the salvage job on May 19, and the work was concluded a month later.  
According to Todd Busch, vice-president of Titan, the Arcangel salvage project posed serious environmental concerns - all of which were successfully addressed by his team of salvage experts.
The Arcangel was grounded on a fringing reef near a major barrier reef inside a national marine park.
Before using their Titan pullers, or hydraulic linear pulling machines - the salvage team had to do some patching of the hull and transfer oil and waste water from the vessel to containers inside a barge to prevent any contamination in the environmentally-sensitive area. The team also had to transfer the ballast and remove some of the heavier items from the vessel. All these tasks were necessary to lighten the vessel and provide as much buoyancy as possible. 
Salvage Master Colin Trepte directed the salvage team as they moved the vessel to a pier nearby Puerto Morelos. The team stabilized the vessel and redelivered it to its owners. Rich Habib, director of salvage, and Mauricio Garrido, director of business development, were also on-site to support salvage operations.

 

Maritime Reporter June 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Salvage

Concordia Tow Update: Smooth Sailing

The Costa Concordia wreck removal team reported this morning at 10:30 a.m. that after 22 hours of navigation, the convoy was over 50 miles off Giglio Island with about 140 miles from Genoa Prà-Voltri.

Legislation Grants Funding for EU's EMSA

EU Council Adopts Regulation on EMSA Funding The European Union Council adopted a regulation yesterday to finance the actions of the European Maritime Safety

Concordia Expected to Reach Genoa Saturday

The Crowley Maritime Corp. subsidiary TITAN Salvage and partner Micoperi have confirmed that the Costa Concordia – the Concordia class cruise ship that wrecked along shores of Giglio Island,

 
 
Maritime Contracts Maritime Standards Offshore Oil Pipelines Port Authority Salvage Ship Repair Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1574 sec (6 req/sec)