TMEIC GE Awarded Contract in Peru

Tuesday, April 14, 2009

TMEIC GE is providing its MaxSpeed crane control system featuring TMdrive-10 controls, Programmable Logic Controller (PLC), and Crane Management Systems for DP World’s new container port in Callao, Peru, near the capital, Lima.

The new container terminal with one million TEU capacity, will initially be constructed with two berths comprising 650 meters of quay line and 22 hectares of yard, and is expected to be operational second quarter, 2010. The berths will initially be capable of handling vessels of up to 8,000 TEU nominal capacity.

Callao is the largest and fastest growing container port on the west coast of South America.
 
(www.tmeicge.com)

Maritime Reporter August 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

Asia-N.Europe Box Rates Jump 26 pct

Shipping freight rates for transporting containers from ports in Asia to Northern Europe jumped by 26 percent to $591 per 20-foot container (TEU) in the week ended on Friday,

CMA CGM-led Consortium Win Box Terminal Bid

The consortium formed by CMA CGM, Bolloré and CHEC won the bid process initiated by the Cameroonian government Following the bidding procedure initiated by the Cameroonian government,

Wärtsilä Wins 2 Regasification Contracts

South Korean shipyard Hyundai Heavy Industries (HHI) has placed two important contracts with Wärtsilä for seawater/propane based regasification modules.

 
 
Maritime Contracts Maritime Security Maritime Standards Naval Architecture Offshore Oil Salvage Ship Electronics Ship Repair Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.4852 sec (2 req/sec)