TMEIC GE Awarded Contract in Peru

Tuesday, April 14, 2009

TMEIC GE is providing its MaxSpeed crane control system featuring TMdrive-10 controls, Programmable Logic Controller (PLC), and Crane Management Systems for DP World’s new container port in Callao, Peru, near the capital, Lima.

The new container terminal with one million TEU capacity, will initially be constructed with two berths comprising 650 meters of quay line and 22 hectares of yard, and is expected to be operational second quarter, 2010. The berths will initially be capable of handling vessels of up to 8,000 TEU nominal capacity.

Callao is the largest and fastest growing container port on the west coast of South America.

Maritime Reporter October 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds


Moody Upgrades Port of Palm Beach

The Port of Palm Beach District announced that Moody’s Investors Service, Inc. upgraded the Port of Palm Beach District senior rating to Baa3 from Ba1, and reported the outlook to be stable.

Singapore-issued CoCs need Revalidation

Holders of Singapore-issued certificates of competency (CoCs) need to revalidate their CoCs to meet the requirements of the 2010 Manila amendments to the International

Asia-N.Europe Box Rates Plunge 17 pct

Shipping freight rates for transporting containers from ports in Asia to Northern Europe fell 17.3 percent to $259 per 20-foot container (TEU) in the week ended on Friday,

Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Naval Architecture Navigation Pipelines Pod Propulsion Ship Electronics Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1386 sec (7 req/sec)