Todd Shipyards to Overhaul Aircraft Carriers

Wednesday, August 27, 2008

Todd Pacific Shipyards Corporation has been awarded a contract by the United States Navy to provide long-term overhaul and maintenance to the Nimitz Class aircraft carriers (CVN) homeported or assigned for maintenance in . The contract consists of multiple contract options for planned incremental availabilities (PIA’s) and docking planned incremental availabilities (dPIA’s) for the USS LINCOLN (CVN 72), USS STENNIS (CVN 74), USS NIMITZ (CVN 68), and the USS REAGAN (CVN 76). The availabilities extend through the last PIA and dPIA ending in 2013. The work to be performed includes non-nuclear ship repair, alteration and maintenance. The work will be performed by the Todd Pacific workforce or Todd Pacific’s subcontractors at the Puget Sound Naval Shipyard in , , the Naval Station in , , or Todd Pacific’s shipyard in .

The work will be performed under a cost-plus-award-fee contract and represents the third such contract for aircraft carrier maintenance awarded to Todd Pacific. The first such contract was awarded in 1999 and the second in 2004. Todd Pacific will be supported in this effort by various regional suppliers and subcontractors.

The total value of all options, if exercised by the Navy, is not determinable until the work under each option is defined. There is no assurance that all options will be exercised, in whole or in part.

Todd Pacific performs a substantial amount of repair and maintenance work on commercial and federal government vessels engaged in various seagoing trade activities in the and provides new construction and industrial fabrication services for a wide variety of customers. Its customers include the U.S. Navy, the U.S. Coast Guard, NOAA, the Washington State Ferry system, the Alaska Marine Highway System, and various other commercial and governmental customers. Todd has operated a shipyard in since 1916.

Maritime Reporter August 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

Sulzer Shareholder has 5 pct Dresser-Rand Stake

Russian billionaire Viktor Vekselberg's Swiss investment firm Renova Group said on Friday it had a 4.99 percent stake in U.S.-based Dresser-Rand, which might become the object of a takeover battle.

Source: Siemens Offering $6.1 bln for Dresser Rand

Germany's Siemens plans to offer more than $6.1 billion, or $80 per share, for U.S. compressor and turbine maker Dresser-Rand, Germany's Manager Magazin said on Friday.

Transas Simulators Boosts Western Shipping Training Center

Transas Marine Pacific has successfully completed the upgrade of a simulator complex for Western Shipping Pte. Ltd. training center. The simulator class was

 
 
Offshore Oil Pod Propulsion Port Authority Salvage Ship Electronics Ship Repair Ship Simulators Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1104 sec (9 req/sec)