Total Reaches LNG Deal with CNOOC

Wednesday, June 18, 2008

Total SA said it had signed an agreement with China National Offshore Oil Corp for the sale of liquefied natural gas to China.
Under a heads of agreement, up to 1 million tons of LNG will be delivered to CNOOC annually starting in 2010, Total said. The gas will be sourced from Total's global LNG portfolio, based on its participation in over 10 liquefaction projects worldwide, and on its trading activities.
A heads of agreement (HoA) is a non-binding document which provides the basis for further discussion and the drawing up of a fully-termed deal.
CNOOC, which leads China's fast-growing LNG market, had in 2006 signed several framework contracts to buy spot LNG from foreign firms including Total and Suez SA in a bid to stabilize imports, which are mainly arranged under long-term contracts.
The latest HoA was the first concrete application of a broader newly-signed memorandum of understanding between the two energy majors, which aims to enhance wide-ranging cooperation in the areas of upstream, downstream as well as in new energies.
Total said it wants to further enhance its cooperation with CNOOC inside and outside China. CNOOC's listed unit, CNOOC Ltd, already has a 45-percent stake in Total's Akpo oil field project in Nigeria.
Total has been present in China for about 30 years through activities of exploration and production, gas, refining and marketing, and chemicals. Total's strategy in China is a long-term one, Jacques de Boisseson, chairman of Total China said last week.

Source:  Shanghai Daily

Maritime Reporter November 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

Sekimizu Welcomes Shipper’s Revised Stance on Ballast Water

IMO Secretary-General Koji Sekimizu has welcomed the reconsideration by the International Chamber of Shipping (ICS) of its position towards the ratification by

EXMAR Orders Second FLNG from Wison

EXMAR NV has placed an order for a second Floating LNG Liquefaction Unit (FLNG) at Wison Offshore & Marine. Under the agreement, Wison will be responsible for the turnkey engineering,

Marseille Fos Unveils Multimillion Growth Strategy

The Marseille Fos port authority has set out a vision for growth over the four years to 2018 in a strategic plan that puts developments costing $560 million at

 
 
Maritime Contracts Maritime Security Naval Architecture Navigation Salvage Ship Electronics Ship Repair Ship Simulators Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.3211 sec (3 req/sec)