Transas Equips Brodospolit Tanker

Thursday, May 27, 2004
Transas has delivered a comprehensive equipment set to the first of two P-960 project tankers to be built at the Brodosplit Shipyard, Croatia. The equipment contract for the two 108,000 tons displacement tanker new buildings was signed in November 2002.

M/T “Sakhalin Island” is supplied with a complete Transas Navi-Sailor 3000 ECDIS, designed in compliance with the latest IMO regulations for UAIS interface, and is enhanced with navigational consoles, ARPA/Radar and Navi-Conning display. The delivery set also contains radio equipment, including GMDSS units, satellite communications and intercoms.

The significance of this contract is that it is the first time Transas has supplied a tanker with a Track-Control System. The system, in conjunction with positioning sources, heading and speed information, is intended to keep a ship automatically on a pre-planned track under various conditions and within the limits of the ship’s manoeuvrability and with minimal participation from the navigator. The route plan for the system is generated in the Navi-Sailor 3000 ECDIS-I system, while the system itself is connected to the automatic helm.

The Transas Track-Control System meets all the requirements of IEC 62065 standard, Catergory C for full track control on both straight courses and turns. It is noteworthy that the certification of the product was conducted onboard the tanker “Sakhalin Island” in the presence of the Det Norske Veritas nautical surveyor. The installation on the second tanker will be completed by the end of this year. Dmitri Lagoutin, the head of Transas’ New-Building Department said: “This contract marks a significant step forward for Transas, which will provide further consolidation of our company’s position among the leading marine transportation equipment manufacturers, and will attract new customers.”

Maritime Reporter March 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Marine Electronics

Schlumberger Announces Q1 Results

Schlumberger Limited (NYSE:SLB) today reported first-quarter 2014 revenue from continuing operations of $11.24 billion versus $11.91 billion in the fourth quarter of 2013, and $10.

Nigeria Maritime Academy Gets Bridge Simulator

A NAUTIS Full Mission Bridge Simulator was purchased and delivered to the Maritime Academy of Nigeria in Oron. The new simulator will be used to provide qualitative

KVH Precision Sensors for Geodetics' Inertial Navigation Systems

KVH Industries entered into a strategic partnership with Geodetics Inc., a leader in the development of real-time, high-precision position and navigation solutions.

 
 
Maritime Careers / Shipboard Positions Maritime Standards Navigation Offshore Oil Pipelines Pod Propulsion Port Authority Ship Electronics Ship Simulators Shipbuilding / Vessel Construction
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0937 sec (11 req/sec)