Transocean Sets Depth Record

Wednesday, May 21, 2008

Transocean Inc. said that the its jackup GSF Rig 127 set a world record for the longest extended-reach well ever drilled at 40,320 ft. (12,289 m) MD (measured depth) with a 35,770-ft. (10,902-m) horizontal section. The well was drilled offshore Qatar in 36 days and incident-free. The new record of 7.6 miles is also the first well in the history of offshore drilling that exceeds 40,000 ft. (12,191 m). The well surpasses by approximately 2,000 ft. the prior extended-reach record of 38,322 ft. (11,680 m) MD set by another drilling contractor with a land rig drilling at Sakhalin Island earlier this year.

The rig's crewmembers, working with the client, Maersk Oil Qatar AS, overcame many constraints, including high drilling torque throughout certain parts of the horizontal section. The Well BD-04A is in the Al-Shaheen field offshore Qatar. Crews used extensive deck-management planning and a supply boat to hold additional drill pipe so that the rig could stay within its variable deck load rating.

Gary Bauer, Transocean's Egypt and Middle East Division Manager, said, "It goes without saying that your accomplishment truly epitomizes and embraces Transocean's vision statement where Rig 127 has a group of highly motivated people dedicated to achieving operational excellence in an incident-free environment and being recognized for delivering superior performance. Well done to the entire Rig 127 Team and continued success in delivering safe, superior performance."

Making the record even more impressive is the fact that the Friede & Goldman L-780 Mod II design jackup, with 250-ft. water depth capability, operates with just two Emsco FB 1600 Mud pumps. Other equipment includes the rig's 2000-hp National 1320 UE Drawworks, and a Varco TDS-4S Top Drive. In addition to its record-setting performance, GSF Rig 127 crews last April reached one year without a lost-time injury.

Maritime Reporter July 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Offshore

Odfjell Drilling in Tighter 2Q North Sea Market

Odfjell Drilling reports second quarter 2014 financial results showing a profit of US$29-million. Profit & loss Q2 2014 Operating revenue for Q2 2014 was USD 272 million (USD 289 million),

Brazil AHTS Contract Breakthrough for Havyard

Havyard says it is to deliver the ship design and equipment for four anchor handling tug supply (AHTS) vessels that are to be built and operated by the Brazilian

EOC Takes Full Ownership of OSVs

On 26 August 2014, EOC Limited agreed to acquire 50% of the entire issued share capital of Lewek Antares Shipping Pte. Ltd. (the "Target") , a company incorporated under the laws of Singapore,

 
 
Maritime Careers / Shipboard Positions Maritime Security Maritime Standards Naval Architecture Navigation Pipelines Pod Propulsion Port Authority Salvage Shipbuilding / Vessel Construction
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1235 sec (8 req/sec)