Tsakos Charter Extension for Suezmax Triathlon

Thursday, February 26, 2009

Tsakos Energy Navigation Limited (NYSE:TNP) announced that the seven year time-charter with profit sharing for the 2002-built double hull suezmax tanker Triathlon will be extended for an additional three years.

The charter, which began in January 2004, will continue with the same charterer. This optional period will extend the total employment of the Triathlon from seven years to ten, until 2014. Since the initiation of this charter in 2004 through the end of 2008, the vessel has generated gross revenues in excess of $62m.

Maritime Reporter June 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

Aberdeen Pupils Peek into Subsea Oil & Gas Technology

Pupils at an Aberdeen primary school were given a rare insight into the depths of the oil and gas industry’s subsea sector after getting to sit in the driving

AVEVA, DNV GL's Sesam Integration Cuts Cost

Integration of Aveva and DNV GL's Sesam Reduces Costs in Maritime and Offshore Engineering. Engineers designing ship hulls and offshore floaters can now save

FORAN for Pertamina's Future Ships

FORAN has been chosen by state-owned company PERTAMINA to review the design of their future oil product carrier ships, under construction in a shipyard with the FORAN System.

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Offshore Oil Pipelines Port Authority Ship Electronics Ship Repair Ship Simulators Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1221 sec (8 req/sec)