Tug Everlast anchors in Portland Harbor

Tuesday, February 19, 2008
The Canadian tug Everlast was anchored in Portland Harbor, Maine, for inspection on Friday after a pump room on the barge it was pushing caught fire Thursday night. While anchored, the 400-foot double-hulled barge was evaluated by a Coast Guard marine inspector and Portland Fire Department officials to determine the extent of the damage caused by the fire. Steps were taken to move the tug and barge to the Portland Ocean Gateway terminal for additional repairs to the installed firefighting systems late Friday evening. “The Portland Fire Department was outstanding in accurately assessing the potential for the fire reflashing and helping to craft an appropriate response strategy to this casualty,” said Capt. Jim Rendon, commander of CG Sector Northern New England. The Coast Guard and the Canadian Transportation Safety Board are working together to look into the cause of the fire.
Maritime Reporter October 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Cruise Ship Trends

MSC Magnifica Completes Drydocking at Damen Shiprepair

After a very fast and successful 17-day drydocking the cruise ship MSC Magnifica left Damen Shiprepair Rotterdam (part of Damen Shiprepair & Conversion) for

Norwegian Buys Ship from Princess Cruises

Norwegian Cruise Line Holdings Ltd. announces fleet expansion for Oceania Cruises in 2016; Sirena to join sister ships Insignia, Regatta and Nautica   Norwegian Cruise Line Holdings Ltd.

MSC Cruises Advance Onboard Wi-Fi System

MSC Cruises has started a fleet-wide optimization installed by Marlink to improve shipboard VSAT (Very Small Aperture Terminal) connectivity. MSC Cruises said it

Casualties

USCG Medevacs Man From Sailboat off NC Coast

The Coast Guard medevaced an injured 62-year-old man from his sailboat Thursday approximately 100 miles east of Kill Devil Hills. Watchstanders at the Fifth

High Seas Becoming Less Secure

Despite the significant reduction in piracy attacks over the last few years it is now widely accepted by the maritime community that the safety of the High Seas

Kleven Wins New Yacht Contract

Norwegian ship builder Kleven has secured a new contract for a high specification, 116-metre long Expedition Support Vessel. The order is placed by Mr Graeme Hart,

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Standards Offshore Oil Pipelines Port Authority Ship Electronics Ship Repair Ship Simulators Shipbuilding / Vessel Construction
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1369 sec (7 req/sec)