USCG Accepts Nat’l Security Cutter Bertholf

Monday, May 11, 2009

The U.S. Coast Guard took final acceptance of the Coast Guard Cutter Bertholf, the first of the Legend class National Security Cutter fleet, at the cutter's homeport of Alameda, Calif., Friday, May 8.

Bertholf's final acceptance is part of the Coast Guard's deliberative acquisition process and represents the moment when the Coast Guard acknowledges that the cutter is ready to transition from an acquisition project to the operations and sustainment phases of the cutter's service life.  The transition also means that funding for maintenance of Bertholf now comes through the Coast Guard's Engineering and Logistics Directorate rather than through the Acquisition Directorate.

"Final acceptance of Bertholf marks a new chapter for the National Security Cutter project and a new era for the Coast Guard," said Rear Adm. Gary T. Blore, assistant commandant for Acquisition. "Today, the first NSC transitioned to operations and sustainment, a major milestone on its path to becoming a fully capable, multi-mission surface asset in the Coast Guard's inventory."

Since preliminary acceptance of the Bertholf, the Coast Guard has continued to work closely with the two, first-tier contractors, Northrop Grumman Ship Systems and Lockheed Martin, other contractors and the U.S. Navy to ensure Bertholf will meet all requirements, including certification to federal government information security standards and TEMPEST electronic emissions standards, Combat System Ship Qualification Testing, flight deck certification and aircraft dynamic interface trials.

Bertholf will continue following the scheduled post-delivery plan as it enters full Coast Guard operation, including mission systems and weapons testing; follow-on manpower and training analysis; and installation of increased communications and sensor capabilities new to the Coast Guard.

The Coast Guard's decision to accept Bertholf complies with the Department of Homeland Security's acquisition authority and is reinforced by the recommendations of a Coast Guard executive board that includes senior leaders of the acquisition directorate, the capability directorate and the technical authorities, which includes the directorates of engineering and logistics, command and control and human resources.

Bertholf represents a significant advancement for the Coast Guard's surface fleet.  With state-of-the-market technologies and capabilities demanded by operational forces to meet the full spectrum of 21st century maritime homeland security, maritime safety, law enforcement and maritime national defense mission requirements.  The Coast Guard is extremely grateful for the partnership and support provided by the U.S. Navy and third-party entities, specifically the Naval Sea Systems Command , to help ensure Bertholf met technical and operational requirements.

The 418 ft Coast Guard Cutter Bertholf leads the eight-ship Legend class.  Designed to be the flagships of the U.S. Coast Guard's modern fleet, the National Security Cutters are capable of executing the most challenging Coast Guard missions.  Bertholf was christened on Veterans Day, 2006, and is named after Commodore Ellsworth P. Bertholf, the first commandant of today's Coast Guard.  Bertholf's sister ships, the Waesche and the Stratton, are under construction in Pascagoula, Miss.  Long lead time materials for the fourth National Security Cutter, the Hamilton, have been ordered.

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter April 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Coast Guard

Fisherman Medevaced off Gloucester Coast

A U.S. Coast Guard crew medevaced a 47-year-old fisherman suffering from chest pains off the coast of Gloucester, Mass.   Watchstanders at Sector Boston’s command

FMC Chairman Applauds USCG Statement on Container Weights

Federal Maritime Commission (FMC) Chairman Mario Cordero commended the Coast Guard for issuing a bulletin last week regarding container weights that he hopes allows

Sipu Muin Modernization Work to Begin in May

Canadian Coast Guard plans upgrades for Air Cushion Vehicle   A scheduled modernization of the Canadian Coast Guard CCGS Sipu Muin will see the Air Cushion Vehicle

Vessels

NASSCO Delivers First ECO Class Tanker for SEA-Vista

On Thursday, April 28, 2016, General Dynamics NASSCO delivered the first ship in a series of three ECO Class tankers currently under construction for SEA-Vista LLC.

Crowley to Christen 3rd LNG-ready Product Tanker

Crowley Maritime Corp. announced it will hold a christening ceremony Thursday, May 5 in New Orleans for the newly built Louisiana, the company’s third of four new Jones Act product tankers.

Harley Marine Orders Two Harbor Tugs

Harley Marine Services announced the construction of two new ship handling vessels to be built at Diversified Marine in Portland, Ore. The two tugs are sister class

 
 
Maritime Contracts Maritime Standards Naval Architecture Navigation Offshore Oil Pipelines Pod Propulsion Ship Repair Ship Simulators Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0968 sec (10 req/sec)