USCG Awards $144M Deepwater Contract

Tuesday, January 04, 2005
The U.S. Coast Guard awarded a contract totaling $144 million to Integrated Coast Guard Systems for production and deployment of the Coast Guard’s second Maritime Security Cutter Large. The WMSL is the largest of three new cutter classes -- and the first under construction -- within the Coast Guard’s Integrated Deepwater System acquisition program.

The Deepwater program will improve the Coast Guard’s counter terrorism, maritime homeland security and overall mission performance capabilities. “The Deepwater program is vital to transforming the Coast Guard and ensuring the delivery of required capabilities needed for the performance of homeland security and other missions,” said Adm. Thomas H. Collins, commandant of the Coast Guard. “The system of systems approach is the most prudent, cost effective and efficient manner to transform the Coast Guard.”

The WMSL characteristics include: a length of 425 feet, a draft of 21 feet, a speed of 29 knots, stern launch ramp, 57mm and .50 calibers guns and dual helicopter hanger capability for both a multi-mission helicopter and unmanned air vehicles.

Fabrication of the first WMSL began in September 2004, with the ship delivery scheduled in 2007. The anticipated delivery schedule for the second WMSL is late 2008.

The Deepwater system's integrator, ICGS, is an equal partnership between Lockheed Martin and Northrop Grumman Ship Systems. ICGS will subsequently issue subcontracts for Northrop Grumman Ship Systems to lead the WMSL production efforts in Pascagoula, Miss., while Lockheed will assume primary responsibility for integrating the ship into the system-wide command, control, communications, computers, intelligence, surveillance and reconnaissance architecture, also known as C4ISR.

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter June 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Coast Guard

ClassNK to Perform AWO Responsible Carrier Audits

The American Waterways Operators (AWO) and ClassNK have signed an agreement under which ClassNK will be authorized to conduct audits of AWO's Responsible Carrier Program,

Waterway Reopened after Barge Grounding

The U.S. Coast Guard has opened the Red River from mile marker 40 to mile marker 42 for vessel traffic, Monday.   The Red River had been closed due to a barge that had run aground at mile marker 41,

Red River Closed after Barge Grounding

The Red River was closed Sunday from mile marker 40 to mile marker 42, after a barge reportedly ran aground and was protruding into the channel near mile marker 41, according to the U.

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Maritime Standards Offshore Oil Salvage Ship Repair Ship Simulators Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0792 sec (13 req/sec)