USCG, Canadian Coast Guard Sign Agreement to Improve Border Security

Monday, May 08, 2006
The Coast Guard and Canadian coast guard signed an agreement in Seattle to improve radar and video surveillance in Cooperative Vessel Traffic Management System waters on the international border. The agreement ensures the Coast Guard will install microwave equipment at the Canadian coast guard facility located at Mount Newton, British Columbia. The equipment will link an existing U.S. facility located at Mount Constitution, Wash., located in the San Juan Islands. A future U.S. facility is scheduled to be installed at Turn Point on Stuart Island, Wash. This facility will improve maritime safety as well as the organized flow of information within Cooperative Vessel Traffic Management System waters.

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter June 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

UASC Shareholding States Vote to Back Hapag-Lloyd Merger

United Arab Shipping Company (UASC) said its six shareholding states backed a merger deal with German container shipping line Hapag-Lloyd AG at a meeting on Wednesday.

List: Top Five UK Ship Owners

Following last week's landmark referendum results, VesselsValue has compiled a list of the top five U.K.-based shipowners and their total fleet value in USD billions.

FMC's Doyle Addresses VGM Rules

U.S. Federal Maritime Commission (FMC) Commissioner William P. Doyle issued a statement on the upcoming implementation of the SOLAS Convention’s verified gross mass (VGM) requirements:   On Friday,

Coast Guard

AWO Authorizes ClassNK to Perform RCP Audits

The American Waterways Operators (AWO) and ClassNK have signed an agreement under which ClassNK will be authorized to conduct audits of AWO's Responsible Carrier Program,

Waterway Reopened after Barge Grounding

The U.S. Coast Guard has opened the Red River from mile marker 40 to mile marker 42 for vessel traffic, Monday.   The Red River had been closed due to a barge that had run aground at mile marker 41,

Red River Closed after Barge Grounding

The Red River was closed Sunday from mile marker 40 to mile marker 42, after a barge reportedly ran aground and was protruding into the channel near mile marker 41, according to the U.

 
 
Maritime Contracts Maritime Security Maritime Standards Navigation Offshore Oil Pod Propulsion Salvage Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0786 sec (13 req/sec)