USN Repair Funds Awarded

Wednesday, May 14, 2008

BAE Systems Norfolk Ship Repair, Norfolk, Va., is being awarded a $5,818,376 modification to previously awarded contract (N00024-05-C-4403) for exercising an option for Program Management Organization (PMO) support for the USS Wasp (LHD-1) FY08 drydocking phased-maintenance availability. The PMO Spec provides the following support: program and production management support, estimating and contract administration services, material services to requisition and coordinate material requirements, technical library services, and provisioning technical documentation. Work will be performed in Portsmouth, Va., and is expected to be completed by Nov. 2008. Contract funds in the amount of $5,818,376 will expire at the end of the current fiscal year. The Mid-Atlantic Regional Maintenance Center, Norfolk, Va., is the contracting activity.

Maritime Reporter March 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Navy

OSI to Integrate Software for UK Royal Navy

OSI Maritime Systems (OSI) announced the signing of a contract to integrate its flagship software, ECPINS-W Sub, into the U.K. Royal Navy’s T45 Destroyer Integrated Bridge System (IBS).

Today in U.S. Naval History: April 24

Today in U.S. Naval History - April 24 1778 - Continental Navy sloop Ranger captures HMS Drake 1862 - Battle of New Orleans; Union Navy under David Farragut

US Navy Completes Korea Ferry SAR Mission

With concurrence from South Korean commanders, the U.S. Navy amphibious assault ship USS Bonhomme Richard (LHD 6) is departing waters around Jindo, South Korea

 
 
Maritime Careers / Shipboard Positions Maritime Standards Naval Architecture Navigation Pipelines Pod Propulsion Port Authority Salvage Ship Repair Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1045 sec (10 req/sec)