USS George Washington Contract Awarded

Monday, June 21, 2004
Northrop Grumman Corporation was awarded a $35.6 million contract from the U.S. Navy for planning work on the aircraft carrier USS George Washington (CVN 73). Northrop Grumman's Newport News sector is the prime contractor for the program and will continue prearrival tasks on this contract that include scheduling; engineering and design work; material procurement; shop prefabrication; ship checks; and personnel training to support the Dry Dock Planned Incremental Availability, scheduled for 2005 at the Newport News shipyard. This contract is a modification to an existing contract awarded last December.

"This is the first time George Washington has been back at Newport News since we delivered her in 1992," said Bob Gunter, senior vice president of the Aircraft Carrier Program at Northrop Grumman Newport News. "Work has been underway for several months. We're looking forward to the ship's arrival and the successful execution of the project."

USS George Washington (CVN 73) is the sixth nuclear-powered Nimitz-class aircraft built by Northrop Grumman Newport News. It was launched in 1990 and delivered to the Navy in 1992. The George Washington is 1,092 feet with a flight deck width of 252 feet and a displacement of 97,000 tons. It can travel in excess of 30 knots.

Maritime Reporter June 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

Aberdeen Pupils Peek into Subsea Oil & Gas Technology

Pupils at an Aberdeen primary school were given a rare insight into the depths of the oil and gas industry’s subsea sector after getting to sit in the driving

AVEVA, DNV GL's Sesam Integration Cuts Cost

Integration of Aveva and DNV GL's Sesam Reduces Costs in Maritime and Offshore Engineering. Engineers designing ship hulls and offshore floaters can now save

FORAN for Pertamina's Future Ships

FORAN has been chosen by state-owned company PERTAMINA to review the design of their future oil product carrier ships, under construction in a shipyard with the FORAN System.

Navy

Fincantieri to Supply Four OPVs to the Bangladesh Coast Guard

Fincantieri has been awarded the contract with the Bangladesh Coast Guard (BCG) for the supply of four Italian Navy “Minerva” class corvettes to be upgraded and

Saab Bags $1 bln Order for Swedish Submarines

The Swedish Defence Materiel Administration (FMV) has awarded contracts worth Skr8.6bn ($1.03bn) to Saab AB for the construction of two new Type A26 submarines

Austal Delivers 7th Cape Class Patrol Boat

Shipbuilder Austal Limited announced it has delivered Cape Wessel, the seventh of eight Cape Class patrol boats being supplied to Australian Border Force under a $330 million design,

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Maritime Standards Offshore Oil Port Authority Salvage Ship Repair Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1985 sec (5 req/sec)