Volvo Penta Introduces D12 Heavy Duty Unit

Monday, December 23, 2002
Volvo Penta introduced the D12 Heavy Duty diesel engine, a 12-liter marine diesel that, with totally electronic control, is the first of a new generation of engines for heavy commercial operations. The D12s new electronics are designed to provide more efficient combustion with improved performance, and lower fuel consumption. The D12 is an in-line, six-cylinder marine diesel feature unit injectors, EDC system, and a sturdy basic design which includes a seven bearing crankshaft.

"The electronics system used in the engine is one very important reason for the engine's high operating safety and reliability," said Anders Hard, a D12 project leader with Volvo Penta. "The EDC system continuously monitors and controls the engines, enabling it to always operate under optimal conditions."

The new engines is totally electronic, with the Electronic Diesel Control system.

Maritime Reporter June 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Marine Propulsion

FORAN for Pertamina's Future Ships

FORAN has been chosen by state-owned company PERTAMINA to review the design of their future oil product carrier ships, under construction in a shipyard with the FORAN System.

CNOOC Acquires Asia's 1st LNG Powered Tug

China National Offshore Oil Corporation (CNOOC) has taken delivery of Asia’s first tugboat Hai Yang Shi You 525, designed to operate solely on liquefied natural gas as ship’s fuel.

Firefighting Vessel Delivered to the US Army

New Orleans based maritime solutions company Technology Associates, Inc. (TAI) informs it has completed its contract for the design and construction of a fast response

Naval Architecture

AVEVA, DNV GL's Sesam Integration Cuts Cost

Integration of Aveva and DNV GL's Sesam Reduces Costs in Maritime and Offshore Engineering. Engineers designing ship hulls and offshore floaters can now save

FORAN for Pertamina's Future Ships

FORAN has been chosen by state-owned company PERTAMINA to review the design of their future oil product carrier ships, under construction in a shipyard with the FORAN System.

Technip Samsung JV Wins 2 FLNG Project Contracts

The Browse project covers the realization and installation of three FLNG units to develop the Brecknock, Calliance and Torosa fields in the Browse Basin, 425 kilometers North of Broome,

 
 
Maritime Contracts Naval Architecture Navigation Pipelines Pod Propulsion Port Authority Salvage Ship Electronics Ship Repair Ship Simulators
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1615 sec (6 req/sec)