Vosta LMG Launches Universal Mk3 Bow

Tuesday, September 09, 2003
Gone are the days when in order to enable coupling of the floating discharge line, it used to be necessary that the bow coupling installations on the dredges were of the same make. With the universal VOSTA MK3 bow coupling installation this has changed.

Currently dredging contractors work with conventional VOSTA installations (MK1 up to MK3) and installations of other manufacturers. With the new universal bow coupling installation it is not only possible to couple a male part of VOSTA make – but also male parts of other manufacturers.

To make the compatibility possible, VOSTA LMG had to replace the spring-ring system with a segmented ring system. Much like the spring-ring, the segmented ring can be increased and reduced in diameter size via the use of a hydraulic cylinder. A second cylinder can lock the segments of the segmented ring in place.

Besides the interoperability an additional advantage of the segmented ring is that, in respect to conventional systems, the surface, which carries the male part is significantly increased. This improvement causes the coupling to be even more robust than before.

In August 2003, VOSTA LMG delivered the third universal VOSTA MK3 bow coupling installation. This installation will be assembled onto a 1,500-cu. m. Trailing Suction Hopper Dredge for Vietnamese customer Waterway Dredging & Construction Company.

Maritime Reporter March 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Finance

Offshore Driller Noble Corp Q1 Earnings Beat Forecasts

Noble Corp., a leading offshore driller, reported first-quarter net income on Wednesday of $0.99 a share, higher than consensus forecasts, as new rigs helped lift revenues.

Crashes in Crucial US Crude Waterway Hit 10-year Low

Serious crashes in the bustling Bay of Galveston have fallen to the lowest level in a decade even as more oil moves on U.S. waterways, official data show, suggesting

All Items Approved at Stolt-Nielsen Meeting

Stolt-Nielsen Limited announced that all agenda items were approved and all nominated directors were elected at its Annual General Meeting of shareholders held yesterday in Bermuda.

Dredging

US FMC Commissioner Visits Panama Canal Expansion Sites

Counsel to the U.S. Federal Maritime Commission informs that  Commissioner William P. Doyle has recently surveyed the construction site on a visit to the Pacific-side of the expanded Panama Canal.

Construction of Changi East Finger Extension

The working period for the construction of Changi East Finger Extension has been extended, GAC said in its daily Hot Port News report. The works will now be conducted from April 25 to October 24,

Houston Ship Channel Dredge Contract Awarded to RLB

Amongst the latest listing of US Department of Defense contracts, RLB Contracting of Port Lavaca, Texas, has been awarded a USD$8,286,850 firm-fixed-price contract

 
 
Maritime Contracts Maritime Security Navigation Offshore Oil Pod Propulsion Ship Electronics Ship Repair Ship Simulators Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1010 sec (10 req/sec)