VT Halter Marine and NOAA to Celebrate Keel Laying

Wednesday, June 13, 2007
VT Halter Marine Inc. and the National Oceanic and Atmospheric Administration will hold a combined keel-laying ceremony on June 15 for two NOAA ships under construction at VT Halter’s Moss Point, Miss., shipyard. Bell M Shimada is the last of four fisheries survey vessels of the same design constructed for NOAA. Ferdinand R. Hassler is a small waterplane area twin hull coastal mapping vessel, the first of its class to be designed and constructed by VT Halter Marine. Both ships were named through NOAA ship-naming contests, an educational initiative held in the regions where the ships will be home ported. Both winning student teams will actively participate in the ceremony.
Maritime Reporter March 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

Japan LNG Imports Hit Record Levels

Japan imported record volumes of liquefied natural gas (LNG) and thermal coal in the fiscal year ended in March, as the country's  shutdowns of nuclear stations

Container Ship Delivers First Boxes to Great Lakes Port

The US Coast Guard say that the 'Fortunagracht', a 450-foot Dutch-flagged container ship, has delivered the first-ever load of containerized cargo to the Great Lakes.

Shipping Turns From Banks to Equity Markets for Cash

Shipping companies are turning to equity markets to fill a growing funding gap, betting that investors hungry for decent returns will provide capital to a sector

 
 
Maritime Contracts Maritime Security Naval Architecture Navigation Pipelines Pod Propulsion Port Authority Ship Electronics Ship Repair Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1002 sec (10 req/sec)