VT Halter Marine Celebrates Ferry Launch

Monday, July 24, 2006
VT Halter Marine, Inc. launched the Island Home, a 255 ft. double-ended ferry built for The Woods Hole, Martha’s Vineyard, and Nantucket Steamship Authority (SSA), on July 21. The Island Home will replace the Islander, a 56-year old ferry currently serving the Woods Hole to Vineyard Haven route. The Island Home was designed by Elliott Bay Design Group of Seattle and is capable of carrying up to 1,200 passengers and crew in comfort and safety. The ferry will also carry 76 vehicles (cars and semi-trailers) and includes hydraulic lift decks for 16 cars. Displacing nearly 1,950 tons when fully loaded and powered by two direct drive EMD diesel engines delivering 6000 hp, it has a top speed of 16 knots.
Maritime Reporter June 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Offshore

Gulf Island Fab Sign Bechtel Offshore Cooperation Agreement

Gulf Island Fabrication, Inc. says it has signed a cooperative agreement with Bechtel Oil, Gas, and Chemicals, Inc. to work together to pursue opportunities for offshore projects for the U.

Farstad Offshore Vessel Squadron Chartered Out

Farstad Shipping ASA reports the following charter contracts, with a total value (including options) of approximately NOK 1.75-billion, as follows: Inpex has awarded

6 MW Offshore Wind Turbine of Siemens Certified

Siemens Energy has obtained type certification of DNV GL for the company's innovative D6 offshore wind turbine. The model Siemens SWT-6.0-154 is equipped with a modern direct drive generator,

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Maritime Standards Pipelines Pod Propulsion Port Authority Ship Electronics Ship Simulators Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0966 sec (10 req/sec)