Wärtsilä, MAN Diesel Hercules-Beta Project

Thursday, April 02, 2009

The Hercules-Beta research project proposal was recently approved by the European Commission. HERCULES-Beta represents a major international cooperative effort to maximise fuel efficiency combined with ultra-low emissions and to develop future generations of optimally efficient and clean marine diesel engines. As such, HERCULES-Beta aims to surpass the current limits set by the International Maritime Organization (IMO) to radically improve the environmental performance of waterborne transport.
 
HERCULES-Beta began on 1 September 2008 with a budget of $33.6m and it is planned to run for 36 months. The project consortium has 32 participants, including engine-component suppliers, equipment manufacturers, universities, research institutions and shipping companies from 10 European countries.
 
HERCULES-Beta is the second phase of the HERULES programme, which was conceived in 2002 as a long-term strategic R&D plan. The project was initiated by Europe's two major engine manufacturers, Wärtsilä Corporation and MAN Diesel. Diesel propulsion systems currently power 99% of the world fleet.
 
The project's principal aim is to reduce marine diesel engine fuel consumption by 10% and to improve the efficiency of marine diesel propulsion systems to more than 60%, significantly reducing CO2 emissions as a result. A further aim of the project is to target ultra-low exhaust emissions by eliminating 70% of NOx and 50% of particulates from marine engines by 2020.
 
HERCULES-Beta comprises 54 subprojects and is funded by the European Commission's Framework Program 7 (FP7, Theme Transport).
 
In 2007, a group of more than 40 European companies, universities and research institutions, led by MAN Diesel and Wärtsilä Corporation, successfully completed a major, 43-month, cooperative research project under the name HERCULES (High Efficiency R&D on Combustion with Ultra-Low Emissions for Ships) with a budget of $44.3m, partly funded by the European Union $20.1m and the Swiss Federal Government $3.4m.
 
The first phase of the HERCULES project concentrated on the development of tools (e.g., simulation software, measurement techniques, etc.) and the general investigation of potential avenues for reducing emissions and fuel consumption. Initially, the project established and operated prototypes. The results stemming from this indicate a great potential for significantly reducing fuel consumption and emissions and reaching the project's ambitious targets.
 
HERCULES-Beta will directly build on the findings of the first phase of the HERCULES project. The tools previously established will be employed to more closely investigate, understand and ultimately optimise the engines. Both analytical investigations as well as prototypes will be refined, based on first-phase results, with the intention of achieving the ultra-low emission and fuel consumption targets. Finally, by carrying out field-tests on the prototypes developed in the first phase, information on the important effect of real-life boundary conditions will be gathered and analysed.
 
(www.ip-hercules.com)

Maritime Reporter September 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Marine Propulsion

ABB's 25th Year in Dubai

ABB Turbocharging is celebrating its 25th anniversary in UAE. Established in 1989 in Dubai, ABB has grown to become a fully-fledged service station capable

Moore Stephens Expects Vessel Operating Cost to Rise

Vessel operating costs are expected to rise by almost three per cent in both 2014 and 2015, according to a new survey by international accountant and shipping consultant Moore Stephens.

Wärtsilä Steerable Thruster Gets Class Approval

DNV-GL approved the design of the Wärtsilä WST-14 thruster, significant as approval was granted based on a thruster design that has yet to be introduced into full series production.

 
 
Maritime Careers / Shipboard Positions Maritime Security Offshore Oil Pipelines Port Authority Salvage Ship Electronics Ship Repair Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1254 sec (8 req/sec)