Wärtsilä Power for Keppel FELS Rigs

Friday, October 07, 2005
The semi-submersible drilling platforms for Keppel FELS will be equipped with generating sets and steerable thrusters from Wärtsilä. Wärtsilä Corporation has been awarded contracts with a total value of above 50 million EUR, by Keppel FELS Ltd in Singapore for 32 diesel generating sets to power four jack-up rigs and two semi-submersible drilling platforms. The combined output of these orders is about 115 MW. Wärtsilä will also supply steerable thrusters for the semi-submersible platforms. The rigs and platforms are being built at Keppel FELS Ltd for the Danish company A.P. Møller - Mærsk A/S. The first of the jack-up rigs is due for delivery in the fourth quarter 2007, and the semi-submersible platforms are due to be delivered in 2008 and 2009. The four jack-up rigs are of the CJ50 design from Marine Structure Consultants. They can operate in water depths of up to 106.7 m, and drill high-pressure wells down to 9144 m. The main power supply on each rig will be provided by four eight-cylinder Wärtsilä 26 generating sets with a combined electrical output of 9600 kWe. For these jack-up rigs, the Wärtsilä generating sets have the benefits of compact dimensions for their power output and an excellent load-response capability for the rapidly changing electrical load when drilling. The two semi-submersible drilling platforms are of the DSS 21 design developed by Keppel and Marine Structure Consultants. They are to be employed for development drilling in deep water up to 3000 m deep and are designed for year round operation in regions such as off West Africa, Brazil, Gulf of Mexico and South East Asia. Each semi-submersible will have a dynamic positioning system with eight electrically-driven Wärtsilä Lips steerable thrusters. The platforms will also be able to be attached to a pre-laid mooring system. The semi-submersible platforms will each be equipped with eight 16-cylinder Wärtsilä 26 generating sets having a combined electrical output of 38,720 kWe.
Maritime Reporter February 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Offshore

Barril Appointed COO of SBM Offshore

SBM Offshore is pleased to announce the appointment of Philippe Barril as Chief Operating Officer (COO) effective March 1, 2015.  Philippe's appointment as a

Sjo Resigns from Polarcus Board of Directors

Polarcus Limited announced that Hege Sjo will resign from its board of directors effective February 2, 2015.   Sjo has accepted an appointment as Deputy Director

BOEM Issues Supplemental Environmental Impact Statement

The U.S. Department of the Interior, Bureau of Ocean Energy Management (BOEM), announces the availability of the Draft Supplemental Environmental Impact Statement

Maritime Security

MMEA Recover Hijacked Tanker

A hijacked Malaysian coastal tanker has been recovered by the prompt actions of the Malaysian Maritime Enforcement Agency (MMEA) off the coast of Malaysia. The

Naval EXPO Coming to Washington

For the first time ever, the general public will be admitted free to the Naval Future Force Science and Technology EXPO general exhibit hall Feb. 4-5 where they

NASSCO to Christen Third MLP, Lewis B. Puller

Shipbuilder General Dynamics National Steel & Shipbuilding Co. – NASSCO – will christen the USNS Lewis B. Puller (MLP 3 AFSB) Saturday, February 7, 2015 in San Diego.

 
 
Maritime Contracts Naval Architecture Navigation Offshore Oil Pipelines Salvage Ship Electronics Ship Repair Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1652 sec (6 req/sec)