Wärtsilä Records High Demand in LNG Sector

Thursday, June 22, 2006
Demand for Wärtsilä's ship power solutions for LNG carriers and offshore applications continued to be exceptionally high during May and June. In the offshore market, Wärtsilä continued to be favoured as the supplier of diesel generating sets for drill ships. During May and June, Wärtsilä received orders from an undisclosed Korean shipyard to supply 24 Wärtsilä 32 diesel generating sets. These diesel generating sets will power four drill ships. The deliveries will take place from 2008 onwards. In the LNG carrier market, Wärtsilä continued to profit from its pioneering work during the past few years in facilitating an industry change from traditionally-applied steam turbine machinery to alternative propulsion and power generation solutions featuring dual-fuel engines. During May and June, Wärtsilä received orders for 26 LNG carriers installations from three Korean shipyards, predominantly featuring Wärtsilä 50DF dual-fuel engines. These deliveries will take place during 2008 - 2010. The value of these new orders amounts to approx. EUR 300 million of which approx. EUR 130 million has been recorded in May order book and EUR 170 million will be recorded in June order book. To date, Wärtsilä engines for totally 49 dual-fuel-electric LNG carriers have been ordered by all together 7 shipyards.
Maritime Reporter July 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

Keel Laid for Holland America Line’s New Ship

Holland America Line celebrated the keel laying of its new 2,650-guest Pinnacle Class ship on August 22 at Fincantieri’s Marghera shipyard in Italy. A 680-ton block

Jones Act is Critical to Conn. Economy

Study shows Connecticut shipbuilding industry worth $2.5 billion to state’s economy, supports nearly 23,000 jobs The American Maritime Partnership (AMP) joined

CWind Launches New Vessel

CWind, a provider of integrated services to the offshore wind industry, has launched its new vessel CWind Fulmar in a naming ceremony in Brightlingsea. The CWind Fulmar, built by CTruk Ltd.

LNG

Policy Uncertainty Threatens to Slow Renewable Energy Momentum

IEA forecast sees renewable power as a cost-competitive option in an increasing number of cases, but facing growing risks to deployment over the medium term. The

SHIPPINGInsight Extends Early-bird Registration

SHIPPINGInsight 2014 is extending the deadline for early-bird registration to Sept. 15. Attendees registering online at www.shippinginsight.com/choose-event prior to midnight Sept.

LNG Finalizes Acquisition of Bear Head LNG Project

Liquefied Natural Gas Limited today informed having finalised the acquisition of 100% of Bear Head LNG Corporation (BHLC). This follows the announcement

 
 
Maritime Careers / Shipboard Positions Maritime Standards Navigation Offshore Oil Salvage Ship Electronics Ship Repair Ship Simulators Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1149 sec (9 req/sec)