Wärtsilä to Supply Engines for 'Clean Design'

Wednesday, February 08, 2006
The new offshore support vessel of Aker ROV 06 design will be equipped with Wärtsilä main engines. Wärtsilä Corporation has been awarded a contract worth about EUR 2.7 million in November 2005 by the Norwegian shipbuilder Aker Yards ASA to supply main engines for a new offshore support vessel contracted by the Norwegian subsea operations company Geo ASA. The vessel will be constructed at Aker Yards' Søviknes shipyard in Norway, with delivery due in May 2007. Its main engines will be four six-cylinder Wärtsilä 32 diesel engines with a combined output of 11,520 kW at 720 rpm. Of the Aker ROV 06 design, the vessel will be employed in subsea operations, primarily for the offshore oil & gas industry. It will be capable of worldwide operation, including the northern oceans. The vessel will principally serve as a mothership for unmanned remotely-operated subsea vehicles (ROV) which can be launched by crane over both sides of the vessel as well as through a moon pool. Requirements concerning the choice of engines included low fuel consumption and fulfillment of the Clean Design notation of DNV classification. The Clean Design notation sets high environmental standards for the control and limiting of all types of emissions and discharges. These standards involve not only the choice of equipment in a vessel, and its installation design but also a vessel's operational procedures.
Maritime Reporter October 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Cruise Ship Trends

Orlando Ashford is President, Holland America Line

Holland America Line announced today that effective Dec. 1 Orlando Ashford will join the company as president to lead the award-winning cruise line's brand and business,

Sustainability Report: Carnival Ahead of Emissions Goal

Carnival Corporation & plc released a report today detailing its sustainability efforts, including initiatives which enabled the company to meet its corporate goal

Meyer Turku Building another Ship for TUI Cruises

Meyer Turku Oy celebrated the start of production of cruise ship Mein Schiff 5 on November 18, 2014, as the cutting machine was started by Mike Schwanke, Marketing

 
 
Maritime Careers / Shipboard Positions Maritime Security Naval Architecture Navigation Offshore Oil Pipelines Pod Propulsion Ship Electronics Ship Simulators Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.2073 sec (5 req/sec)