Wärtsilä Wins 16 LNG Engine Orders

Friday, March 31, 2006
In the first two months of 2006, Wärtsilä Corporation won orders for a further 16 Wärtsilä 50DF dual-fuel engines to power four LNG (liquefied natural gas) carriers contracted in Korea. In January Wärtsilä was awarded an order to supply two sets of four Wärtsilä 50DF dual-fuel engines to Daewoo Shipbuilding & Marine Engineering (DSME) of Korea. These engines will be installed in two dual-fuel-electric LNG carriers contracted by Bergesen Worldwide Gas of Norway, and are the first Wärtsilä 50DF dual-fuel engines to be ordered by DSME. In February Hyundai Heavy Industries and Hyundai Samho Heavy Industries of Korea ordered two sets of four Wärtsilä 50DF dual-fuel engines to power two dual-fuel-electric LNG carriers for Mitsui OSK Lines (MOL) of Japan. These latest contracts bring the total orders to 104 Wärtsilä 50DF engines for 26 dual-fuel-electric LNG carriers. In addition to these Wärtsilä 50DF dual-fuel engine contracts, Wärtsilä also received orders for the slightly smaller Wärtsilä 32DF dual-fuel engine type. DSME ordered a twelve-cylinder unit to complement the steam turbine machinery installation on a 151,000 m³ LNG carrier with onboard LNG regasification installation (LNG-RV) for Exmar of Belgium. West Contractors of Norway ordered one set of four six-cylinder units to power a dual-fuel-electric offshore supply vessel for Eidesvik Shipping of Norway.

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter May 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

Bay Shipbuilding Delivers ATB to Moran

Fincantieri Marine Group’s Fincantieri Bay Shipbuilding (FBS) has delivered the Articulated Tug Barge unit (ATB) Barbara Carol Ann Moran and the 110,000-barrel

Conrad Shipyard Christens Woods Hole Ferry

M/V Woods Hole, a 235-foot long passenger ferry built for the Steamship Authority of Woods Hole, Mass., was christened on May 20 at Conrad Aluminum in Amelia, La.

Tech & Design Solutions for Modern Workboats

EPA Tier 4 regulations (for engines of 804 hp and higher) and propulsion advancements have many manufacturers and vessel designers changing course to adapt to new requirements and customer demands.

LNG

Tech & Design Solutions for Modern Workboats

EPA Tier 4 regulations (for engines of 804 hp and higher) and propulsion advancements have many manufacturers and vessel designers changing course to adapt to new requirements and customer demands.

EGAS: Egypt to tender for 10 LNG Cargoes

Egypt will tender next week to import 10 cargoes of liquefied natural gas (LNG) for delivery in July and August, an official from the state gas company, EGAS, said on Thursday.

Cheniere to Roll Out Second LNG Unit

Cheniere Energy Inc. plans to start exporting liquefied natural gas in August from a second plant at its Sabine Pass terminal in Cameron Parish, according to a report from Bloomberg News.

 
 
Maritime Contracts Maritime Standards Offshore Oil Pipelines Salvage Ship Electronics Ship Repair Ship Simulators Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1378 sec (7 req/sec)