Waiver of Maritime Lien

Wednesday, October 26, 2005
The U.S. Court of Appeals for the First Circuit ruled that a letter from the holder of a maritime lien to the vessel owner that the lien holder was pursuing the dispute in a non-federal court and that it had no objection to sale of the vessel constituted a waiver of the maritime lien. In the instant case, the port authority had provided long-term berthing space to a vessel. The berthing fees were unpaid due to a dispute between the port authority and the vessel owner over the adequacy of the facilities. In order to expedite the sale and removal of the vessel, the port authority provided the vessel owner with a letter stating that it had no objection to the sale of the vessel and that the on-going dispute over berthing charges was being controverted in local court. The day after the sale was consummated, the port authority asserted its maritime lien and had the vessel arrested. The court held that the port authority had taken affirmative and purposeful steps to lead third parties to believe that it was foregoing the maritime lien. Puerto Rico Ports Authority v. Barge Katy-B, No. 05-1016 (1st Cir., HK Law).
Maritime Reporter November 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Finance

NSRP Awards $11m for R&D Project Portfolio

The Executive Control Board of the National Shipbuilding Research Program (NSRP) has selected a new round of research and development projects for award, as part

Nicaragua Building China-led Canal to Rival Panama

Nicaragua on Monday broke ground on its Chinese-led $50 billion shipping canal, a massive infrastructure project that aims to rival Panama's waterway and revitalize

Marseille Fos Unveils Multimillion Growth Strategy

The Marseille Fos port authority has set out a vision for growth over the four years to 2018 in a strategic plan that puts developments costing $560 million at

Casualties

NZ Report: Human Error to Blame for Rena Grounding

New Zealand's Transport Accident Investigation Commission (TAIC) published its final report into the grounding of containership Rena in October 2011. The TAIC’s

Report: Dire Conditions in Indian Shipbreaking Yards

Report by Indian research institute reveals poor enforcement of occupational health and safety provisions   The working and living conditions at the shipbreaking yards of Alang,

Wrecked Bulker’s Bow Refloated, Scuttled off S.Africa

TITAN Salvage, Crowley Maritime Corp.'s Houston-based marine salvage, emergency response and wreck removal company, has refloated and scuttled the largest section of the wrecked bulk carrier, Smart.

 
 
Maritime Contracts Offshore Oil Pipelines Pod Propulsion Port Authority Ship Electronics Ship Repair Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1152 sec (9 req/sec)