Wesmar Thrusters Propel Alaska Ferry to Success

Wednesday, September 11, 2002
For years the citizens of Prince of Wales Island in southeast Alaska were only able to commute to the Island of Ketchikan on a weekly basis, leaving them frustrated and isolated. In January of 2002 the 150 passenger car/ferry Prince of Wales entered service providing a much awaited daily transportation link between the two islands, and providing the 5,000 residents of the remote southeast Alaska region with a critical link and regular, reliable service-something they had long been without. It took long years of hard work to accomplish this contact with the outside. The community, unhappy with the level of service provided to them by the Alaska Marine Highway system, took matters into their own hands and in 1998 established their own ferry system to serve the Prince of Wales Island communities of Craig, Klawock, Thorne Bay and Coffman Cove, connecting them to the Island of Ketchikan. The project created its own Port Authority with the State's blessing and built the new $12 million ferry. The Prince of Wales, is 197 ft. long by 53 ft. wide, and was built at Dakota Creek Industries in Anacortes, Wash. It is a modern ship with airline-style seats throughout, a reading lounge, work and study areas, a galley, a children's area and an outside covered passenger walkway with a solarium and overhead heaters, making it as comfortable as possible for the six-hour daily round trip from the Hollis dock on Prince of Wales Island to Ketchikan. The terminal at Hollis is setup for side-loading, so the new ferry has a side door for loading and unloading at Hollis. The need for a bowthruster on the Prince of Wales ferry was established in part because it loads and unloads alternately from the stern and the starboard.

Positioning and holding the vessel close to the dock in both cases requires the combined power of the bow thruster, and dual controllable pitch propellers. This is where the powerful Wesmar 200 hp dual prop electric bowthruster earns its keep as it holds the ferry tight against the dock. In Ketchikan, the ferry backs into a new dock and loads and unloads through a center door in the stern. Here much of the work is done with the 72-in. controllable pitch propellers. Together the thruster and the controllable pitch propellers move the 96-ton vessel to and from the dock, front and back, port to starboard. The car deck capacity is 30 autos or a combination of cars and up to 10 freight vans. To save space and weight, the vans are generally loaded and unloaded with small yard tractors at each end. Further accommodations have been made for large trucks to go in the middle or on the port side. Maximum height is just over 15 ft. The Prince of Wales was built by Dakota Creek Industries Inc., Anacortes, Washington, 90 minutes north of Seattle one of the most modern, medium-sized shipyards in the United States. The facility is located on a deep water, protected channel in Anacortes and is recognized for its quality new vessel construction, ranging from high speed aluminum catamaran ferries to factory trawlers and ocean-going tugs. Ship repair, conversions, and upgrades have also been an important service provided to both U.S. and international ship owners. Dakota Creek Project Manager on the Prince of Wales was Dave Longdale. He said the Wesmar unit works well and the installation was smooth.

Maritime Reporter July 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Marine Propulsion

Krill Supplies VFMMS to Island Tug and Barge

Krill Systems Inc., a producer of Vessel Fuel Measurement and Monitoring Systems (VFMMS), announced delivery, installation and successful sea trials of three more systems to Island Tug and Barge Ltd.

MN 100: Delta T Systems, Inc.

858 west 13th Court Riviera Beach, FL 33404 Telephone: 561 204 1500 E-mail: michael.gabriel@deltatsystems.com Website: www.deltatsystems.com CEO/President:

CMA CGM Chairman Visits Bow-Refitted Containership

During the recent call in Beirut, Lebanon, of the 'CMA CGM Columba', Mr. Jacques R. Saadé, CMA CGM Group's Chairman and Chief Executive Officer, visited the 11,400 TEU ship.

Passenger Vessels

Iconic Star Ferry in Move to New Wan Chai Pier

With effect from the first departure on Saturday 30 August 2014, Hong Kong's “Wan Chai – Tsim Sha Tsui” ferry service will operate from the new Wan Chai Ferry Pier.

Propulsion Woes Bring Queen Victoria to Early Refit

Cunard’s Queen Victoria to undergo multimillion dollar refit at Blohm & Voss Shipyard in January 2015, nearly one year ahead of its planned December 2015 maintenance.

Indonesia Tourist Boat Sinking: Update

Bad weather was hampering a desperate search on Monday for two foreign tourists still missing after a boat travelling between two Indonesian islands sank at the weekend,

 
 
Maritime Contracts Maritime Security Naval Architecture Offshore Oil Pipelines Port Authority Ship Electronics Ship Repair Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1164 sec (9 req/sec)