Wilhelmsen Wins Contract from Meyer Werft

Wednesday, August 19, 2009

Wilhelmsen Marine Engineering won an order from Meyer Werft in Germany to finalize the cruise ship AIDAblu and two new cruise vessels, NB689 (unnamed) and NB690 (unnamed) being built for the German cruise operator, AIDA Cruises. Under the terms of the deal, Wilhelmsen Marine Engineering's subsidiary, Wilhelmsen Callenberg Fläkt will deliver heating, ventilation and air conditioning (HVAC) systems and related engineering services. The order has an estimated value of EURO 10.4 million.

The company has been involved in AIDA's new building program since 2004 and has delivered HVAC system design and advanced equipment to AIDAdiva, AIDAluna, AIDAbella and AIDAblu. The latest contract with Meyer Werft is very significant, said Mikael Ströby, Wilhelmsen Marine Engineering's director for the new building and cruise segments. "It confirms that we are also competitive in today's tighter market and can meet the exacting demands of leading shipbuilders and operators alike." Prior to the AIDA projects at Meyer Werft, Wilhelmsen Marine Engineering successfully delivered a similar project to the Queen Mary 2, a Cunard vessel and, like AIDA Cruises, a member of the Carnival group.

Email AddThis Feed Button Share
Maritime Reporter January 2012 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

Jensen to Design Fireboat for San Francisco

Fireboat to be Equipped with Six Fire Monitors and 26 Manifold Valves for High-Volume Water and/or Foam Firefighting.     Jensen Maritime Consultants, Inc.

J.F. Lehman to Acquire NRC from Seacor

J.F. Lehman & Company Announces Definitive Agreement to Acquire National Response Corporation from SEACOR Holdings, Inc.   J.F. Lehman & Company,

Harvey Gulf Inks LNG OSV Contracts

Harvey Gulf signs contracts to buld two additonal U.S. flag LNG-powerd vessels.   Harvey Gulf International Marine ordered two additional 302’ X 64’,

Cruise Ship Trends

Cruise Industry Adopts New Drill Policy

Best Practice Identified Through Cruise Industry Operational Safety Review.   The global cruise industry today announced a new emergency drill policy requiring

Dutch Decks for German-built Passenger Ships

German shipbuilder Meyer Werft and Dutch deck specialist Bolidt Kunststoftoepassing BV have extended their close relationship. This includes work on the latest

Underwater Stern Tube Seal Replacement

When a 204-meter cruise vessel suffered an oil leak in its stern tube seal assembly, Hydrex was asked to carry out a permanent seal replacement.   The repair

 
 
Maritime Careers / Shipboard Positions Maritime Standards Naval Architecture Navigation Offshore Oil Pod Propulsion Port Authority Salvage Ship Electronics Shipbuilding / Vessel Construction
mobi | rss feeds | archive | history | articles | privacy | contributors | top news | about us | copyright