Wind Farm Workers Evacuated from Barge

Tuesday, February 03, 2009

At 8:26 a.m., the morning of Jan. 30, Liverpool Coastguard were contacted by workers on the work barge UR101 reporting that the barge anchor cables were breaking in heavy seas.

The barge had 42 workers onboard and the barge was secured by four anchors, at various times during the night three anchor cables broke leaving the barge secured by only one anchor.

A decision was made to evacuate the barge in worsening weather conditions throughout the night. Initially, thirty three workers were evacuated by the barge tug Kingcraig and two support vessels Voe Jarl and Maggy M.

The nine remaining workers this morning made a decision that the situation had worsened and for the safety of life contacted the coastguard for assistance.

Liverpool Coastguard called out Maryport Coastguard rescue team and requested a helicopter from ARCC Kinloss. Workington RNLI lifeboat was also requested to launch.

The weather in the area is 48 knot winds with squally conditions and a 4-5 metre swell.

Su Daintith, Watch Manager, Liverpool Coastguard said:

Our priority at the moment is the safety of life, we have search and rescue units on scene, who are working closely with the barge support vessels to recover all the workers to a place of safety.

Maritime Reporter April 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Casualties

IMO Conference to Address Ferry Safety

Conference on the enhancement of safety of ships carrying passengers on non-international voyages, Manila, the Philippines, April 24, 2015   The International

Bulk Carrier Grounds in St. Lawrence Seaway

A 621-foot bulk carrier ran aground near Wellesley Island in the St. Lawrence River, Monday. The U.S. Coast Guard (USCG) is responding.   The Bahamian-flagged

Shipwrecked Bodies Brought Ashore, EU Proposes Doubling Rescue Effort

The European Union proposed doubling the size of its Mediterranean search and rescue operations on Monday, as the first bodies were brought ashore of some 900 people

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Standards Naval Architecture Pipelines Salvage Ship Repair Ship Simulators Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1060 sec (9 req/sec)