Woodside to Evade LNG Concerns with New Ships

Friday, January 20, 2006
According to Bloomberg, Perth-based Woodside Petroleum Ltd. plans to skirt concern among Californians about the safety of liquefied natural gas import terminals by delivering the fuel directly into pipelines from ships moored offshore. Australia's second-biggest oil and gas producer will invest to develop the new technology and get access to the most populous U.S. state. In June, Woodside withdrew from a plan to build a permanent LNG terminal in the state, which relies on imports for 87 percent of its gas. Larger rivals including BHP Billiton have so far failed to persuade Californians to accept construction of terminals on or near the mainland and ease a gas shortage that helped to boost prices more than fourfold since 2001. Woodside operates Australia's biggest LNG venture, the North West Shelf. The company may supply California from its proposed $3.7 billion Pluto LNG project in Western Australia. Gas could also be supplied from the undeveloped Browse and Sunrise fields, also off northwestern Australia, Bloomberg reported. (Source: Bloomberg)
Maritime Reporter July 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

LNG

S.Africa Considering Ship-Based Power Generation

South Africa could deploy power barges using gas to generate electricity to help overcome chronic supply shortages, a senior government official said on Tuesday.

Egypt Gets FSRU from BW Gas

Norway-based BW Gas will provide Egypt with a liquefied natural gas (LNG) floating import terminal under a five-year contract.   This comes as as the North African

Tanker Retrofitted with Dual Fuel Engine

Caterpillar Marine informs it has begin a dual fuel engine retrofit conversion onboard the 472-foot Fure West tanker, owned by Furetank Rederi A/B. The MaK M 43

Coast Guard

Asian Nations Call for Stop to South China Sea Land Work

Calls grow for China to halt land reclamation. Southeast Asian countries on Tuesday backed a U.S. call to halt land reclamation in the South China Sea, underlining

Latest USCG Cutter At Boston Harbor

The Coast Guard’s latest 418-foot National Security Cutter James (WSML 754) entered Boston Harbor August 3, 2015. The James is the fifth of eight planned National

Coast Guard Monitors Oil Recovery Ops near Bayonne, NJ

Coast Guard crews are continuing to monitor oil recovery operations (ORO) in the water near the International-Matex Tank Terminal (IMTT) Bayonne, New Jersey, Monday.

 
 
Maritime Contracts Maritime Security Naval Architecture Navigation Port Authority Salvage Ship Electronics Ship Repair Ship Simulators Shipbuilding / Vessel Construction
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1882 sec (5 req/sec)