Guido Perla & Associates, Inc. Designs GPA 675J PSVs

Press Release
Monday, February 25, 2013
GPA 675J

Naval Architecture and Marine Engineering firm Guido Perla & Associates, Inc. (GPA) was awarded a contract to deliver the Design, Regulatory Design and Production Engineering for two GPA 675J PSVs for Jackson Offshore Operators.

 

The vessels will be constructed at BAE Systems in Jacksonville, Florida, under a contract that includes the option for two additional vessels.


Throughout the design and engineering process, GPA worked closely with Jackson Offshore Operators to meet all operational requirements, giving the ships the features and functions that operators and crew members appreciate during operation and maintenance.  The result is a customized vessel with optimized cargo capacity, improved fuel consumption, ease of maintenance, redundancy, excellent maneuverability, superb seakeeping and highest safety and comfort standards for the 34 crew members the vessel can accommodate.  


“We see it as a vote of confidence that GPA was chosen as such an integral part of this fleet expansion and are continuing to develop our partnership with Jackson Offshore Operators.  For the last eight years, GPA has been very involved successfully designing for the international offshore market.  We are excited to be able to complement that success with new, modern designs specifically for  the Gulf of Mexico and apply our skills and experience to make this project a resounding success,” says Guido Perla, Chairman of GPA.


GPA’s proven design standards offer an economical solution that evolved throughout many years by working with clients in developing the most practical and economical vessel to construct and turning complex ideas into reality.  These established standards include many GPA methods and ideas that enable shipyards to build more vessels in less calendar time in a cost-saving manner while owners benefit from a vessel that provides efficient operations meeting the highest standard of the industry.


For the GPA 675J PSV, GPA is using their new series of hull forms that provides a more efficient hull compared to previous designs.  A new bow design has been developed that encompasses GPA’s special shaped bulb and forward sections that allows for better sea keeping on any sea direction.  Many new bow designs offered recently are designed to favor head sea operations, but GPA’s design provides a more balanced bow that will enhance operation in head sea, but also on any other sea directions.  This gives a more overall performance to the hull by balancing the stern with the bow of the vessel.  


The first vessel with these new hulls has been tested in Brazil with the GPA 688SC PSV (PSV 4500). Eight of these vessels are under construction in Brazil.  The GPA 675J PSV also incorporates notable features that GPA has utilized throughout the years on numerous offshore vessels, such as the location of the engine room on the main deck.  The layout increases cargo capacity below deck and entails remarkable crew comfort improvements, achieved by adding an extra deck of attenuation between the accommodations and the bow thrusters and cargo machinery, two of the prime contributors of noise and vibration aboard these types of vessels.  GPA pioneered this engine room arrangement several years ago on the ten-vessel GPA 654 PSV series operating in the Gulf of Mexico.  “When we began to consider our fleet growth strategy we immediately targeted GPA to develop a PSV design to meet the current and long-term needs of the deepwater offshore drilling and production market,” stated Lee Jackson, President and CEO of Jackson Offshore Operators.  “The design has been well received as indicated by the long term contracts we have secured on the two new GPA 675J PSVs we are building with BAE.”


GPA’s independence allows Jackson Offshore Operators to be flexible in their equipment  selection and combine vendors that are most suitable for this customized design.   The main equipment on the 76 meter (252 ft) GPA 675J PSV includes an integrated Rolls-Royce ship systems package inclusive of low-voltage active front end diesel-electric system and a complete propulsion package with Azipull propulsion thrusters.  The scope of supply also includes power and propulsion systems integration - including an advanced Acon automation system, an Icon Dynamic Positioning (DP-2) system and a fully integrated electrical detailed engineering package. This clearly shows the flexibility of GPA adapting their designs to meet any equipment manufacturer requirements and satisfying owner desires and best fit for the project.

The GPA 675J PSV will bear the class notation ABS, +A1, Circle E Offshore Support Vessel (Supply-HNLS), +AMS, DPS-2,  FiFi-1, ACCU, SOLAS, USCG Subchapter I& L, Full Ocean, USCG EEP150 Notation, MARPOL Annex I, II, IV and V and increases the number of GPA-designed offshore vessels operating in the Gulf of Mexico to 22.  The vessels are expected to enter into service in 2014. 

Maritime Reporter May 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

Hyundai Heavy Delivers 2,000th Ship

Hyundai Heavy Industries (HHI) has become the world's first shipbuilder to deliver its 2,000th ship. The world's largest shipbuilding company delivered a drillship, "Ocean BlackLion," to U.

DNV GL’s Synergi to Manage Siem Offshore Newbuilding Projects

Siem Offshore has chosen DNV GL’s Synergi Project to manage nine newbuilding projects. Synergi Project software The software is used to optimize the collaboration

Bahri Inks Contracts with Hyundai to Build 5 VLCCs

The National Shipping Co. of Saudi Arabia (Bahri) signed contracts on Thursday with Hyundai Samho Heavy Industries (HSHI) to build five very large crude carriers (VLCCs),

Offshore

EIVA Welcomes New Global Director

The Danish offshore survey solution specialist EIVA a/s has appointed a new global sales director, Jakob Møller Nielsen. He comes from a similar position at SPX Flow Technology,

ASRY in Maritime Deal with Relay

UK-based engineering firm signs service agreement to provide direct services to vessels in ASRY, expanding the list of the yard’s onsite specialist contractors.

Harnessing Offshore Wind Peaks in U.S.

For the US energy industry, 2014 will be remembered as the year when crude oil prices fell below 50$/bbl, resulting in significant realignments in the sector.

Naval Architecture

Alaska, Washington to build Arctic Icebreakers

Senator Lisa Murkowski, Alaska, and Senator Maria Cantwell, Washington, have introduced a bill that would authorize the Navy to build up six icebreakers for use by the U.

China, Russia Conclude Naval Drill

Russia and China naval forces concluded their first-ever joint military exercise in the Mediterranean Sea this morning, according to an online news briefing from the Chinese Defense Ministry.

SSI to Showcase New Software at Nor-Shipping

SSI informs it will showcase the latest versions of its CAD/CAM software, ShipConstructor and EnterprisePlatform, at Nor-Shipping 2015, June 2-5. SSI CEO Darren

Vessels

ASRY in Maritime Deal with Relay

UK-based engineering firm signs service agreement to provide direct services to vessels in ASRY, expanding the list of the yard’s onsite specialist contractors.

Avance VLGCs Fixed

Avance Gas said repairs of two very large gas carriers (VLGCs) are complete, allowing the delayed ships to get to work.   Both new build VLGCs recently dry-docked - Breeze (83,

Dortmund Port's Throughput Up

In 2014, Dortmund’s combined goods throughput on ships and trains amounted to 5.7 million tonnes, compared to 5.3 in the previous year. 2.9 million tonnes (+600,000) of this was ship related.

Offshore Energy

EIVA Welcomes New Global Director

The Danish offshore survey solution specialist EIVA a/s has appointed a new global sales director, Jakob Møller Nielsen. He comes from a similar position at SPX Flow Technology,

ASRY in Maritime Deal with Relay

UK-based engineering firm signs service agreement to provide direct services to vessels in ASRY, expanding the list of the yard’s onsite specialist contractors.

Harnessing Offshore Wind Peaks in U.S.

For the US energy industry, 2014 will be remembered as the year when crude oil prices fell below 50$/bbl, resulting in significant realignments in the sector.

 
 
Maritime Careers / Shipboard Positions Naval Architecture Navigation Offshore Oil Port Authority Ship Electronics Ship Simulators Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.2331 sec (4 req/sec)