A New Shipyard Opens in Azerbaijan

Marinelink.com
Friday, September 20, 2013
Photo: www.socar.az

President of Azerbaijan, H.E. Ilham Aliyev, graces the official opening of new Baku Shipyard
 


A new shipbuilding yard that is jointly developed by Keppel Offshore & Marine Ltd (Keppel O&M), State Oil Company of Azerbaijan Republic (SOCAR) and Azerbaijan Investment Company (AIC) was officially opened this morning by President of Azerbaijan, H.E. Ilham Aliyev. Singapore's Senior Minister of State for Trade and Industry, Mr Lee Yi Shyan, also attended the inauguration ceremony of the new yard.
 


Named Baku Shipyard LLC (Baku Shipyard), the new 62-ha yard in Baku, Azerbaijan, is designed to undertake the construction of a wide range of specialised vessels and merchant ships including subsea vessels, anchor handling tug/supply vessels and multi-purpose offshore support vessels such as platform supply vessels, as well as tankers and cargo vessels. The yard also has ship repair and conversion capabilities.



Baku Shipyard adds to Keppel's existing footprint in Azerbaijan where it has been operating the Caspian Shipyard Company (CSC), also a joint venture between Keppel O&M and SOCAR, since 1997.



Keppel O&M currently has 10% share in the new yard, while SOCAR and AIC own the remaining 65% and 25% respectively. Keppel O&M will be responsible for the management and operation of the yard.



Phase 1 of the yard was built at an estimated cost of US$470 million. When operating at full capacity, it is able to undertake up to 100 repairs and conversions per annum and is estimated to achieve an average annual steel output of 25,000 tons. Plans for Phase 2 include the construction of a graving dock with added facilities for offshore projects.



The yard is already in discussions on several potential new projects ahead of its opening, and has received two contracts worth about US$50 million in total - to construct one unit of 50-tonne bollard pull azimuth stern drive tug and one set of pontoons for a semisubmersible in conjunction with CSC.



Mr Tong Chong Heong, CEO of Keppel O&M, said, "The inauguration of Baku Shipyard signals the opening of a new and additional chapter in the long-standing partnership between SOCAR and Keppel O&M. Our participation in the yard demonstrates our commitment to be a long-term solutions provider for Azerbaijan.



"From our years of cooperation with SOCAR in CSC, we have accumulated a rich reservoir of technical know-how as well as meaningful market insights and networks to operate a first-class shipyard. SOCAR and Keppel O&M will continue to leverage our collective strengths to achieve new successes through our partnership in the Baku Shipyard.



"In this regard, Baku Shipyard will also build upon CSC's experiences, and at the same time support CSC in its construction activities. The new yard reinforces Keppel O&M's Near Market, Near Customer strategy and enables us to unlock synergy in our Caspian operations. We are hence confident that our enhanced presence in Azerbaijan will place us in good position to capture more growth opportunities and contribute significantly to the region's energy sector."



Mr Rovnag Abdullayev, President of SOCAR, said, "We are very happy that our partnership with Keppel O&M has once again borne fruit with the successful opening of Baku Shipyard. With the strong growth potential in Azerbaijan's oil and gas sector, we believe that Baku Shipyard is well placed to support this growth and contribute to the country's economic development.



"As a leading global offshore and marine group, Keppel O&M will bring its invaluable experience to Baku Shipyard, and we are confident that our combined strength will propel the facility into an internationally recognised centre of excellence in shipbuilding, repair and conversion."



Following the inauguration of the Baku Shipyard, President of Azerbaijan, H.E. Ilham Aliyev named a new floating drydock at the yard. He also officiated at a strike steel ceremony for the semisubmersible drilling rig that is being built by CSC for a subsidiary of SOCAR, Caspian Drilling Company Ltd. Built to Keppel's proprietary design, DSSTM38M, the rig is expected to be completed in 4Q 2016.



The above mentioned joint venture and contracts are not expected to have any material impact on the net tangible assets and earnings per share of Keppel Corporation Limited for the current financial year.

Maritime Reporter January 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

ASA Mission Statement Revised to Expand Reach

The American Salvage Association has revised its mission statement to increase its area of influence beyond North America, complemented by a new logo that reflects the expanded direction.

New Chemical Handling Service from Ferguson Group

Tank, Fluid Solutions and Bunded Storage for Dangerous Goods and Chemicals Introduced at Gap Ridge, Karratha.    Ferguson Group Australia, global specialist in offshore DNV 2.

BP Freezes Pay in 2015 to Cut Costs

BP is freezing base pay across the group this year, the latest in a series of steps by oil majors to cut costs in response to sinking oil prices.   Over the past year,

Shipbuilding

Huisman Cranes for New Maersk Subsea Support Vessels

In December 2014, Huisman secured a contract from COSCO (Dalian) Shipyard for the delivery of four customized 400mt Rope Luffing Knuckle Boom Cranes and two 100mt

Coast Guard Cutter William Trump Commissioned

The Coast Guard Cutter William Trump was commissioned during a ceremony at Coast Guard Sector Key West Saturday Jan. 24, 2015. The Trump is the 11th fast response cutter in the Coast Guard fleet.

World's Largest Ship Sparks Outrage

Jewish groups in the Netherlands and Britain have reacted with rage and despair at the arrival in Rotterdam of the world's biggest ship, the Pieter Schelte, named

Offshore

New Chemical Handling Service from Ferguson Group

Tank, Fluid Solutions and Bunded Storage for Dangerous Goods and Chemicals Introduced at Gap Ridge, Karratha.    Ferguson Group Australia, global specialist in offshore DNV 2.

InterMoor Completes Juniper Mooring Installation Contract

InterMoor has completed a mooring and foundation installation campaign for bpTT’s Juniper gas project offshore Trinidad and Tobago, reportedly the largest foundation

Boost for Offshore Wind Energy

As part of President Obama’s Climate Action Plan to create American jobs, develop domestic clean energy resources and cut carbon pollution, Secretary of the Interior

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Pipelines Pod Propulsion Port Authority Salvage Ship Repair Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.2571 sec (4 req/sec)