Marine Link
Saturday, December 3, 2016

BAE Systems to Overhaul Fast Combat Support Ship

July 5, 2007

BAE Systems (BAESY) has been awarded a contract by the U.S. Navy's Military Sealift Fleet Support Command for a 60-day overhaul of the fast combat support ship USNS Arctic (T-AOE 8). The contract includes options which, if exercised, would bring the cumulative value of the work package to $7.9 million. All work on the Military Sealift Command ship will be performed at BAE Systems Norfolk Ship Repair starting in July and is expected to be completed in September 2007.

USNS Arctic's primary mission is to rapidly replenish Navy task forces and carry more than 177,000 barrels of oil; 2,150 tons of ammunition; 500 tons of dry stores; and 250 tons of refrigerated stores. The ship receives petroleum products, ammunition and stores from shuttle ships and redistributes these items simultaneously to carrier strike group ships.

BAE Systems' work on the Arctic includes drydocking the ship; cleaning and painting the underwater hull and freeboard area; opening, cleaning, gas freeing and testing tanks; overhauling sea valves; and accomplishing various electrical, communication and navigation equipment repairs, along with U.S. Coast Guard inspection items, machinery inspections and repairs and underway replenishment equipment repairs.



 
Maritime Reporter Magazine Cover Nov 2016 - Workboat Edition

Maritime Reporter and Engineering News’ first edition was published in New York City in 1883 and became our flagship publication in 1939. It is the world’s largest audited circulation magazine serving the global maritime industry, delivering more insightful editorial and news to more industry decision makers than any other source.

Subscribe
Maritime Reporter E-News subscription

Maritime Reporter E-News is the subsea industry's largest circulation and most authoritative ENews Service, delivered to your Email three times per week

Subscribe for Maritime Reporter E-News