USCG Cutter Biscayne Bay Hauled Out

By Michelle Howard
Monday, May 19, 2014
Photo courtesy of The Great Lakes Group

Great Lakes Shipyard hauled out the United States Coast Guard Cutter Biscayne Bay  using its 770-ton capacity Travelift.

 

The repair contract that started on May 7, 2014, includes drydocking and routine maintenance such as:

  • Hull Plating and Ultrasonic Testing
  • Appendages and Leak Test
  • Shaft Seal Assembly and Overhaul
  • Rudder Assembly, Remove, Inspect and Reinstall
  • Anchor Windlass, Level 2 Inspect and Repair
  • Vertical Capstan, Level 2 Inspect and Repair
  • Propulsion Shafting, Remove, Inspect, and Reinstall
  • And Other Various Cleaning, Inspections, and Repairs

 

This is the second of the USCG’s six (6) Great Lakes stationed 140-foot Bay Class ice breaking tugs to be drydocked using Great Lakes Shipyard’s new Marine Travelift. The Shipyard’s Travelift has also been used to lift one of the 150-foot Buoy Barges pushed by the Bay Class Tugs, and the USCGC Buckthorn, stationed in Sault Ste. Marie, Michigan. The Travelift is the largest on the Great Lakes in the United States and Canada, second largest in the Western Hemisphere, and third largest in the world. It was specifically designed and sized for Great Lakes Shipyard to accommodate the Bay Class Coast Guard Cutters and other vessels.

 

Work on the Biscayne Bay  is to be completed by late July.

 

Maritime Reporter March 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Ship Repair & Conversion

Austal Graduates 48 4-Yr Apprentices

Austal USA combined two classes to graduate a total of 48 members of Austal’s cutting-edge four-year apprenticeship program yesterday at a formal ceremony held at the Arthur R.

BAE Systems to Expand San Diego Shipyard

BAE Systems announced it will invest approximately $100 million to expand drydocking capabilities at its San Diego shipyard.   The investment, which will include

Washington State Ferry Tacoma Returns to Service

Washington State Ferry M/V Tacoma will return to work on the Seattle/Bainbridge Island route starting March 28 after suffering electrical damage last summer.   The

Coast Guard

USCG Flush Ice down River Systems to Facilitate Shipping

The Coast Guard cutter fleet is flushing ice through the Great Lakes river systems to prevent ice jams and facilitate commercial shipping as the shipping season

Mediterranean Rescue Operations Strain Shipping

The Wall Street Journal ran a story yesterday describing how the increasing number of seaborne migrants making the journey from Africa to Europe has not only

Greek Ferry Still Stuck

The Greek ferry that ran aground just outside of port on the Aegean Island of Kassos Wednesday night is still stuck. The 227 passengers and 55 crew aboard the

Vessels

Transit Waiting Times for Panama Canal

Non-booked regular sized vessels wishing to transit the Panama Canal face a wait of approximately 5-6 days. There has been a dramatic increase in the transit

Washington State Ferry Tacoma Returns to Service

Washington State Ferry M/V Tacoma will return to work on the Seattle/Bainbridge Island route starting March 28 after suffering electrical damage last summer.   The

Greek Ferry Still Stuck

The Greek ferry that ran aground just outside of port on the Aegean Island of Kassos Wednesday night is still stuck. The 227 passengers and 55 crew aboard the

 
 
Naval Architecture Offshore Oil Pipelines Pod Propulsion Port Authority Salvage Ship Electronics Ship Simulators Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1621 sec (6 req/sec)