Bollinger Delivers Coast Guard FR-Cutter

Press Release
Wednesday, May 22, 2013
Sister Ship Margaret Norvell: Photo credit Bollinger Shipyards

Bollinger Shipyards, Inc. deliver  'Paul Clark', the sixth Fast Response Cutter (FRC) for the United States Coast Guard.

The announcement was made by Bollinger executive vice president of new construction, Chris Bollinger:  “We are very pleased to announce another successful on-time and on-budget FRC delivery to the Coast Guard.  The Paul Clark was delivered to the 7th Coast Guard District in Key West, FL, and will be stationed at USCG Sector Miami.  We are all looking forward to the vessel’s upcoming commissioning, as well as honoring and celebrating the heroic acts of Paul Clark.”

The 154 foot patrol craft Paul Clark is the sixth vessel in the Coast Guard's Sentinel-class FRC program. To build the FRC, Bollinger Shipyards used a proven, in-service parent craft design based on the Damen Stan Patrol Boat 4708.  It has a flank speed of 28 knots, state of the art command, control, communications and computer technology, and a stern launch system for the vessels 26 foot cutter boat.  The FRC has been described as an operational “game changer,” by senior Coast Guard officials.

Each FRC is named for an enlisted Coast Guard hero who distinguished him or herself in the line of duty. This vessel is named after Coast Guard Hero, Fireman First Class Paul Clark, who displayed fierce bravery in the highest traditions of military service during the allied assault on French Morocco during World War II.  Clark served as a landing boat engineer and beach master on the USS Joseph T. Dickman.  Clark displayed extraordinary devotion to duty in the face of enemy fire as he transferred an injured fellow crewmember to safety on the USS Palmer, then courageously returned to his station at the beach to complete the mission.


 

Maritime Reporter August 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

Ingram Barge Order 20 Tank Barges for 2015

Ingram Barge Company say they will be building 20 tank barges in 2015 to meet growing demand for chemical shipments. While most of the company’s recent tank barges have come through acquisitions,

ClassNK Issues New Rules for Inland Waterway Ships

Leading classification society ClassNK has released new technical rules and guidance for the survey and construction of inland waterway ships. As a result

Steel Cut for Third RCI Quantum-class Cruise Ship

The steel cutting for 'Ovation of the Seas', scheduled to be delivered in the autumn of 2016, took place at the Meyer Werft shipyard in Papenburg, Germany, where 'Quantum of the Seas',

Coast Guard

USCG Cutter FIR Participates in Puget Sound Oil Spill Exercise

The crew of Coast Guard Cutter Fir, a 225-foot buoy tender homeported in Astoria, Oregon, participated in a Spilled Oil Response System exercise near Blake Island, Washington, Wednesday.

USCG in Search of Missing Man in Lake Michigan

The Coast Guard is searching for a man who went missing on Lake Michigan, Tuesday. Missing is 48-year-old Joseph Kiehm from Milwaukee. Kiehm was last seen aboard his 26-foot white sailboat,

Lake Charles Tugboat Engine Room Fire Extinguished

The Coast Guard informs that along with the Black Bayou Fire Department it has responded to a tugboat on fire near Lake Charles, Louisiana. At approximately 1:15 p.

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Standards Naval Architecture Pod Propulsion Port Authority Salvage Ship Repair Ship Simulators Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1774 sec (6 req/sec)