BWTS in a Box Fits in Cargo Hold

Press Release
Wednesday, January 23, 2013
File BWTS Box Technology: Image credit MHI
BWTS Box Technology: Image credit MHI

New ClassNK-approved container-type Ballast Water Treatment System (BWTS) installation technology.

Mitsubishi Heavy Industries, Ltd. (MHI), working jointly with Mitsui O.S.K. Lines, Ltd. (MOL), has developed installation technology of a ballast water treatment system (BWTS) enclosed in a standard-size freight container for installation in the hold of container ships.

The new technology will significantly reduce BWTS retrofitting turnaround time in comparison to engine-room BWTS installation. Going forward, MHI and MOL will strengthen proposal-based marketing of the new technology as a key solution for Ballast Water Management (BWM) Convention compliance.

The container-type BWTS houses most devices necessary for ballast water treatment in a 40-ft high-cube container - approx. 12.2meters (m) in length, 2.4m in width x 2.9m in height. Within the container, the devices are arranged to maximize available space and facilitate maintenance. 



When installing the container-type BWTS in the ship hold, preliminary surveys are simplified because the only major work needed is ballast water intake/discharge and power line connection. In most cases, work can be completed in approximately two weeks, about seven days less than installation in an engine room. The work does not require cutting of the ship's side shell, and can be completed at pier, eliminating the need to drydock.

The container-type BWTS is ideal for ships that do not have enough space in the engine room for related systems and piping.



MHI and MOL will verify the new system's operation by installing it on MOL Competence, an 8,100 teu (20-ft equivalent unit) container ship that MHI built at its Nagasaki Shipyard and Machinery Works and delivered to MOL in 2008. MHI has already begun detailed design of a system with the capacity to process 750 cubic meter (m3) of ballast water per hour on the ship, with installation slated for this spring.



Email AddThis Feed Button
Maritime Reporter May 2013 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Technology

Intertek Opens Malaysian Exploration and Production Center

Intertek invested £900,000 (4,143,720 Malaysian Ringgit) in a new Malaysian regional center which will bring enhanced services to the exploration and production (E&P) sector in the region.

Kraken Completes U.S. Navy Sonar Trials

Kraken Sonar Systems Inc. announced that its Cooperative Research and Development Agreement (CRADA) with the U.S. Navy’s Naval Undersea Warfare Center (NUWC) in Newport, Rhode Island was successful.

MHI : Landmark LNG Carrier Shipbuild Contract

On May 17, 2013, Mitsubishi Heavy Industries Ltd. (MHI) will sign an agreement with Mitsui O.S.K. Lines Ltd. (MOL) to build a Sayaendo series new-generation liquefied natural gas (LNG) carrier.

New Products

Omega's Debuts New Thermistor Probes

Omega introduced its new Thermistor Probes with M12 Connections, to be featured at the Sensors Expo and Conference. The TH-21 Series thermistor probes are constructed

Omega Launches New Thermocouple Connectors

Omega introduced compensated M12 thermocouple connectors, to be featured at Sensors Expo and Conference. The M12-FM series is a new Omega connector that will ensure accuracy for your applications.

New Explosion-proof Pressure Transmitter from AST

American Sensor Technologies, Inc. (AST) released the AST46DS Explosion-Proof Pressure Transducer with Display with pressures from 1 to 20,000 PSI available. The

Ballast Water Treatment

IMO’s GloBallast Partnerships Awarded “Best Innovative Project”

IMO’s GloBallast Partnerships Project, which assists developing countries and their maritime industries for implementation of the international regulations on ballast

Wärtsilä BWTS Receives IMO Final Approval

Wärtsilä has received the Final Approval status from the International Maritime Organization's (IMO) Marine Environment Protection Committee (MEPC) for its Wärtsilä

Ship Energy, BWMS, Recycling on MEPC Agenda

The IMO's Marine Environment Protection Committee (MEPC) meets for its 65th session from 13 to 17 May 2013, at IMO HQ in London. Items on a busy agenda include

 
 
mobi | rss feeds | archive | history | articles | privacy | contributors | top news | about us | copyright