Goa’s Casino Royale at Three Years

Wednesday, March 09, 2011

In 2011 Goa’s most elaborate floating casino will celebrate three years of successful operation on the Indian province’s Mandovi River. The M/V Casino Royale was designed by AMC Marcon of Mumbai and her builder Water Ways Shipyard with the lines of a small cruise ship. The ship has capacity for up to 400 passengers, 35 operational crew and seven professional mariners. The Casino Royale is out-fitted to meet international safety standards for a passenger vessel. Although she is equipped to sail, the 70 by 14 meter vessel remains anchored in the Mandovi River as required by local gaming regulations.

 
To meet these regulations, the vessel is fitted with a pair of KTA19-M3 main engines, rated for 500 HP each at 1800 RPM that can give her a speed of nine knots. To provide power for the five operational decks with a total of 12000-square-feet of gaming space the ship is also outfitted with three 350 kW generator sets.
 
For delivering passengers to and from the mainland, there are six swift feeder boats that ferry the gamers between Casino Royale’s private jetty and the vessel.
Maritime Reporter June 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Marine Propulsion

WEG to Showcase Drive Solutions at SMM

WEG, a global supplier of drive systems, will showcase its range of systems for the shipbuilding and offshore industry at this year’s SMM (Shipbuilding, Machinery & Marine Technology Fair) in Hamburg.

Scottish Sea Farms Takes New Vessel Delivery

Scottish Salmon Farms has taken delivery of its latest vessel – powered by twin Doosan V158TIH main engines supplied by WaterMota.   Designed by consultant naval

There’s Still Time for SHIPPINGInsight Award Entries

Entry submissions for the first SHIPPINGInsight Award are due Friday, Aug. 1, but organizers said they will continue to accept nominations through following week to provide some extra time.

Vessels

Scottish Sea Farms Takes New Vessel Delivery

Scottish Salmon Farms has taken delivery of its latest vessel – powered by twin Doosan V158TIH main engines supplied by WaterMota.   Designed by consultant naval

Pre-Mooring Safety Inspections at Trieste, Italy

The SIOT/TAL Terminal at Trieste has advised that the TAL Pre-Mooring Safety Inspection program will be modified from 1 September. The checks at road will affect:

Hornbeck Offshore Ride High on Q2 2014 Results

Hornbeck Offshore Services, Inc. has announced its financial results for the second quarter ended June 30, 2014.  Following are highlights for this period and excerpts

 
 
Maritime Careers / Shipboard Positions Maritime Security Maritime Standards Pipelines Port Authority Salvage Ship Electronics Ship Repair Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0827 sec (12 req/sec)