Veka-Group Building Catamarans for Offshore Industry

press release
Monday, August 06, 2012
Catamaran 19m

Veka-Group builds a series of catamarans for the offshore industry. The vessel has been specially developed for crew tendering and offers also enough deck space for transporting three 10 ft containers. The first vessel, destined for an operator of a wind farm, will be delivered mid September.

 

Stable, fast and economical
‘A monohull built without special devices, is far from stable on the waves’, says Veka project manager Robin Sijbrands. ‘The special characteristic of a multihull is that it hardly rolls. Aboard a multihull people don’t get seasick easily. Furthermore a catamaran sails much faster than a monohull. The “wind farm catamaran” has a lower resistance, a higher stability and, thanks to her special design, a considerably lower weight and consequently a significantly lower fuel consumption.’

 

Sijbrands talks about a ‘very clever construction’. ‘The accommodation has not been placed on the hull afterwards but it forms an integral part of the hull. As a result the construction is not only stronger but also lighter in weight. With the same finish and facilities the “wind farm catamaran” weighs about 20% less than a traditionally built catamaran. Fuel consumption is also roughly 20% less, which is a big contribution to the operating costs taking into account the many sailing hours these kinds of vessels usually make.’  

 

Spacious and secure
There is room aboard for twelve passengers and three crewmembers. Two 10 ft containers can be placed on the fore deck. The aft deck offers place for a third 10 ft container. ‘The wheelhouse is situated over the passengers lounge, says Sijbrands. ‘In this way the captain has a good all-round visibility and thanks to the three skylights there is also a good upwards visibility. This is important when mooring the catamaran at the final workplace of the passengers.’

 

Whereas other vessels need a stabilization system and a Dynamic Positioning system for holding a steady position at all times while mooring, the “wind farm catamaran” does not need these devices. ‘We have made special sturdy fenders around the vessel. The moment the captain pushes the catamaran, using the water jets and the engine power, to the mooring post, there is so much friction that the vessel sticks to that position. Thanks to this special characteristic disembarking is, even with waves up to a height of two meters, perfectly safe.’

 

Special facilities
A heavy foundation has been included in the hull at the fore and the aft. ‘This makes it possible to place a crane for putting containers or a ROV overboard’, explains Sijbrands. ‘That way also an underwater inspection can be carried out.’

 

Short delivery terms
Veka-Group has a large number of shipyards in the Netherlands and abroad. At the site where the “wind farm catamaran” is being built, the company has three production halls of 60 by 25 meters with a workable height of 18 meters. ‘We can, just at this location, build ten catamarans per year’, says Sijbrands. ‘Between the moment of signing the contract and the final delivery we need  six to eight months depending on our order book.’

 

Drawings of the 24 meters version are available
The current catamaran has a length of 19.40 meters. Considering the interest shown from the market the Veka-Group has already made the drawings for a 24 meters version. ‘We see it as our responsibility to anticipate the developments’, says Sijbrands. ‘In the future more wind farms will be built at greater distances from the coast so that larger vessels will be required. To design a new version when we are negotiating an order would lead to unacceptable long delivery times. Therefore we took the initiative and we now have the drawings available for the larger version.   As soon as a customer places the order, production can be started immediately.’

 

Multinational
Veka-Group has been active in the maritime sector since 1988. In the almost 25 years of her existence the company has gone through exceptional developments and has become an all-round maritime service provider. In addition to the construction of inland waterway vessels, seagoing vessels, working vessels and luxury sailing boats and motor yachts Veka also has its own shipping company and its own logistics company. The Veka-Group owns shipyards in Werkendam, Heusden, Lemmer and Wieringerwerf. The company has also shipyards in  the Czech Republic, Romania, Poland, Ukraine, Bulgaria, China and Serbia. Thanks to joint ventures Veka-Group has access to sites in Russia, Vietnam, Egypt, Turkey, France and Belarus.

 

Technical specifications Catamaran 19m:

 

  • Length:   19,40 meter
  • Width:     7,00 meter
  • Draught:    1,00 meter
  • Propulsion:    2      MTU 8V2000 M72 979 hp
  • Water jets:    2      Hamilton Jet HM 571
  • Maximum speed: 26      knots
  • Drinking water capacity:    500 liter
  • Fuel capacity:   6.000 liter
  • Accommodation: Seats for 12 passengers
  •    Crew: 3
  •    Deck space –> 73 m²
  •    Containers – > 3 x 10 ft (2 on the fore deck, 1 on the aft deck)

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter May 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

HII Secures Aircraft Carrier Planning Contract

Huntington Ingalls Industries (HII) was awarded a $152 million contract for advance planning for the construction of the third aircraft carrier in the Gerald R.

Maritime Future Summit: Digital Shipping

Autonomous ships, smart on-board systems: At the Maritime Future Summit on September 5, industry leaders will discuss the future of shipping. For the first time

'K' Line Takes Delivery of Corona Series Coal Carrier

Kawasaki Kisen Kaisha, Ltd., Tokyo, (“K” Line) has announced the delivery of Corona Victory, an 88,000 DWT-type special coal carrier at Marugame Shipyard of Imabari Shipbuilding Co.

Workboats

Master Marine Delivers Z-drive Towboat to Marquette

Marquette Transportation Co. has taken delivery of a new 2,000-hp Z-drive towboat from Master Marine, Inc., Bayou La Batre, Ala.   The 78' x 34’ x11' vessel, St.

KOTUG Begins Operations in Mozambique

KOTUG Mozambique has begun exclusive port and terminal towage services with two Rotortugs in the new port of Nacala-a-Velha in northern Mozambique for Nacala Development Corridor (CDN),

Cheoy Lee Joins the Robert Allan Ltd. ‘Century Club’

On April 26, 2016, China’s Cheoy Lee Shipyards launched its 100th vessel built to a Robert Allan Ltd. design, becoming the second shipyard worldwide to do so, following Sanmar’s achievement in 2013.

Wind Power

Subsea 7 Awarded $1bn Wind Farm Offshore UK Deal

Subsea 7 S.A. informed today the details of the major(1) contract award that was first announced on 20 May 2016 . The contract was awarded by Beatrice Offshore Windfarm Limited (BOWL)(2),

Cyclone Roanu kills 21 in Bangladesh

A cyclone battered coastal Bangladesh on Saturday, killing at least 21 people and injuring many more, but has now weakened into a depression that the weather office

Tuco Marine Bags Wind Farm Service Boat Order

Tuco Marine Group of Denmark informs it has inked a new order for its 11-meter wind farm service boat from the ProZero series of fast rescue boats, daughter crafts and workboats.

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Maritime Standards Naval Architecture Pipelines Port Authority Ship Simulators Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1153 sec (9 req/sec)