Charleston Container Volume Up 12%

Press Release
Friday, April 22, 2011
File

Charleston, SC – Container shipping volume through the Port of Charleston increased nearly 12 percent in the first three quarters of the fiscal year, and the state’s breakbulk tonnage increased 48 percent, even as the pace of volume gains has slowed.

In the July to March period, container traffic increased 11.6 percent to 1,033,062 20-foot equivalent units (TEUs), up from 925,837 TEUs in the same period last year.  March volume alone was 120,265 TEUs, up 5.7 percent from March 2010.

“While the rate of growth is slowing from last year’s initial volume recovery, we are still moving in the right direction,” said Jim Newsome, President & CEO of the South Carolina State Ports Authority (SCSPA).  “New distribution and manufacturing investments in the state and across the region, as well as export strength, will be felt in the coming months.”

Vessel calls were also up for the nine-month period, rising 11 percent to 1,271 ships.

At the Ports of Charleston and Georgetown, breakbulk cargo, including automobiles, project cargo, heavy lift shipments, were up 48 percent to 754,000 tons cfrom 511,000 tons in the first three quarters of 2011.  A $21-million investment at Charleston’s Columbus Street Terminal is increasing the port’s breakbulk cargo-handling capacity.

“Through Columbus Street Terminal, the Port of Charleston now offers a ro-ro, heavy lift and project cargo terminal that rivals the best out there,” said Newsome.  “With on-dock rail, excellent oversize clearances inland, substantial lay-down areas and mobile lifting capacity up to 500 tons, Charleston offers tremendous capabilities.”

At its regularly monthly meeting today, the SCSPA Board approved engineering services related to the relocation, realignment and removal of container cranes at Columbus Street and Wando Welch terminals.  Shaw GBB will perform the services at a cost of $277,518.

The entire project, estimated at nearly $5 million, is driven by increasing arrivals of ships too large for the Panama Canal.  Every week, Charleston receives four post-Panamax ships actually drafting up to 48 feet.

The SCSPA Board also approved security, entrance and roadway improvements at Veterans Terminal at a cost of $522,000.  The project will be covered primarily by federal port security grant funding.

Source: South Carolina State Ports Authority

Email AddThis Feed Button
Maritime Reporter May 2013 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Ports

Açu Superport: A Modern Port Concept for Brazil

Brazil “Rotterdam of the Tropics” After spending a day exploring the sprawling Açu Superport and Industrial Complex construction site far up the northeast coast

POLB Formalizes Its Energy Policy

The Long Beach Board of Harbor Commissioners' energy policy aims to secure a more sustainable and resilient supply of power as demand grows. The Energy Policy

Jobs for Veterans: Port Fellowship Program

The Port of Seattle is now recruiting for its Veterans Fellowship Program. The Port of Seattle says it is dedicated to helping military personnel transition from active duty to civilian employment.

Container Ships

Five 18,400 TEU Containerships to be Classed by GL

Germanischer Lloyd (GL) has signed a classification agreement with Hyundai Heavy Industries (HHI) for the construction of five 18,400 TEU containerships. The so

Port of Montreal Open to post-Panamax Ships

The Canadian Coast Guard (CCG) authorizes the passage of vessels up to 44 metres wide in the Quebec-Montreal section of the St. Lawrence navigation channel. The previous authorized width was 32.

MOL (Canada) Inc. to Serve Canadian Liner Market

Effective August 1, 2013, Mitsui O.S.K. Lines, Ltd. will begin operating in Canada as MOL (Canada) Inc. MOL (America) Inc. and Montship, Inc. today jointly announced

 
 
mobi | rss feeds | archive | history | articles | privacy | contributors | top news | about us | copyright