MacGregor Crane with Three-Axis Motion Compensation

MarineLink.com
Tuesday, May 07, 2013

MacGregor, part of Cargotec, developed an offshore crane featuring three-axis motion compensation to carry out installations, repairs, maintenance and general service duties in the renewable energy and oil and gas markets

A 74m infield support vessel (ISV) will debut a new MacGregor offshore crane that delivers full three-axis (x, y and z) compensation, enabling equipment to be landed on small, high platforms with little margin for error. Siem Moxie is under construction at Fjellstrand shipyard in Norway and will operate in the offshore renewable energy and oil and gas markets for Siem Offshore. The crane has a safe working load of five tons at a 25m outreach; delivery is scheduled for January 2014.

"Siem Offshore approached MacGregor's Competence Center for Advanced Load Handling, Offshore in Kristiansand, Norway, to develop the crane especially for the vessel," said Frode Grøvan, Director, Sales and Marketing, Advanced Load Handling.

One specific task for Siem Moxie will be to transfer equipment to the top of offshore windmill foundations to install power cables and other apparatus used for windmill installation and maintenance.

"The landing platforms are about 20m above the water and they are only 4m2, so precise load handling is essential," Mr. Grøvan said. "Although MacGregor's standard active heave compensation (AHC), supplied through a crane's winch, compensates for a vessel's vertical movements, a greater degree of precision was required in this case."

The crane, which has a hydraulically-tilting foundation, is mounted at the center point of the vessel. "Although all areas of the vessel experience the same angular movements in a seaway, positioning the crane at the center of the vessel minimizes the actual physical displacement of the crane and its load," Mr. Grøvan explained. "The tilting foundation compensates for pitch and roll, maintaining the crane pedestal vertical with respect to the sea bed; active heave compensation provides the third degree of stabilization."

A motion reference unit (MRU) will be the primary sensor for calculating heave motion. In addition, a secondary sensor placed at the crane boom tip will be used to verify the MRU's accuracy and provide overall redundancy, adding to the system's safety.

www.cargotec.com

 

Maritime Reporter September 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Offshore

Renewable Energy: Schottel Tidal Turbines Ready For Use

In the last months Schottel  successfully tested its hydrokinetic turbines in Strangford Lough, Northern Ireland. The full-scale tests included 260 operating hours under realistic conditions.

Total CEO Killed in Moscow Runway Accident

Private jet collided with snow plow during takeoff; Total's CEO a defender of Moscow policies. Insiders Boisseau and Pouyanne long seen as potential successors.

Statoil: New Oil in the Grane Area

Statoil has together with PL169 partners proved new oil resources in the D-structure in the vicinity of the Grane field in the North Sea.   Well 25/8-18 S, drilled by the rig Transocean Leader,

Energy

Russian Minister to Intervene with Gazprom on Slovakia Gas Flow

Russia's Energy Minister Alexander Novak will intervene with Gazprom to raise reduced gas shipments to Slovakia to contracted levels, Slovakia's economy ministry

Total Names Refining Boss to Replace de Margerie

French oil company Total has appointed refining boss Patrick Pouyanne as chief executive to succeed Christophe de Margerie who was killed in a plane crash in Moscow this week.

Asia-Pacific Solar Collaboration Conference

The Australian Photovoltaic Institute is holding the inaugural Asia-Pacific Solar Research Conference at the University of New South Wales in Sydney from 8-10 December 2014.

Marine Equipment

Virtual AIS Beacons Employed in MH370 Search

Vesper Marine, a manufacturer of marine safety products and virtual Aids to Navigation (ATON), announced that its Virtual AIS Beacons are employed in the search

ISS Manages Heavy-lift Project at Port of Mombasa

Inchcape Shipping Services (ISS) announced it has completed another complex heavy-lift project in Africa, this time at the Port of Mombasa in Kenya. ISS was

New Gate Transits the Panama Canal

The first gate for the new locks in the Pacific side began transit Wednesday morning through the Panama Canal, signaling another historic milestone in the progress of the Expansion Program.

 
 
Maritime Contracts Maritime Security Navigation Pipelines Port Authority Salvage Ship Electronics Ship Repair Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1157 sec (9 req/sec)