Alaskan Ferry Repower Completed

Posted by Eric Haun
Monday, August 25, 2014
M/V Columbia (Photo: EBDG)

Elliott Bay Design Group (EBDG), a naval architecture and marine engineering firm with offices in Seattle, New Orleans and Ketchikan, Alaska, today announced the completion of the M/V Columbia repower. EBDG provided design services and ongoing owner support services for the ferry's repower, which was performed by Vigor Marine in Portland, Ore.

"The Columbia was designed for the Alaska Marine Highway System (AMHS) by EBDG's predecessor firm, so we're intimately familiar with the vessel and its systems," said EBDG Project Manager Matt Williamson. "The main engines were at the end of their useful life and the AMHS opted for replacing them, along with replacing or upgrading drive train components and auxiliary systems where it made economic sense. Replacing the main engines is a significant undertaking in the life a vessel. EBDG's strong familiarity with the Columbia made us the natural choice as the designer for this repowering project."

For nearly 40 years the Columbia has been the Alaska Marine Highway System's flagship vessel, linking a number of inside passage communities. The 418-foot vessel accommodates 625 passengers and features two vehicle decks with capacity for 134 vehicles.

In addition to its support of the Columbia, EBDG has a long history of assisting ferry operators with an array of services, such as transportation studies, concept designs, capital budgets, security improvements and mid-life refurbishments.

ebdg.com
 

Maritime Reporter March 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Ship Repair & Conversion

Scandlines Ferry Back in Service by End June

The damaged Scandlines ferry M/V Prinsesse Benedikte is being repaired at the Polish shipyard Remontowa and is expected to be ready before the end of June 2015.

Austal Graduates 48 4-Yr Apprentices

Austal USA combined two classes to graduate a total of 48 members of Austal’s cutting-edge four-year apprenticeship program yesterday at a formal ceremony held at the Arthur R.

BAE Systems to Expand San Diego Shipyard

BAE Systems announced it will invest approximately $100 million to expand drydocking capabilities at its San Diego shipyard.   The investment, which will include

Maritime Security

Vietnam's Submarines to Counter China?

Vietnam's new submarines could alter the balance in the South China Sea quite dramatically, say maritime security analysts.   Vietnam and China have long contested

US Navy to Roll out Underwater Spy Satellites

The robotic series that remade crusade in skies will shortly extend to a low sea, with underwater view “satellites,” drone-launching pods on a sea building and unmanned ships sport submarines,

India May Add Japanese Soryu-Class Submarines to its Fleet

India is reportedly considering a project to incorporate six Japanese Soryu-class diesel-electric submarines into its fleet, says The Japan Times.   The Defense

News

Gulf Bridge Express Service to End

The Gulf Bridge Express Service will shortly be terminated with the last roundtrip voyage being MV Saint Nikolaos voyage 00008S, ETA New Orleans on April 22, 2015.

Obangame Express 2015 Concludes in the Gulf of Guinea

Maritime forces from Gulf of Guinea nations, Europe, South America, and the United States and several regional and international organizations concluded the multinational maritime exercise,

Scandlines Ferry Back in Service by End June

The damaged Scandlines ferry M/V Prinsesse Benedikte is being repaired at the Polish shipyard Remontowa and is expected to be ready before the end of June 2015.

Vessels

Gulf Bridge Express Service to End

The Gulf Bridge Express Service will shortly be terminated with the last roundtrip voyage being MV Saint Nikolaos voyage 00008S, ETA New Orleans on April 22, 2015.

Obangame Express 2015 Concludes in the Gulf of Guinea

Maritime forces from Gulf of Guinea nations, Europe, South America, and the United States and several regional and international organizations concluded the multinational maritime exercise,

Scandlines Ferry Back in Service by End June

The damaged Scandlines ferry M/V Prinsesse Benedikte is being repaired at the Polish shipyard Remontowa and is expected to be ready before the end of June 2015.

Ferries

Scandlines Ferry Back in Service by End June

The damaged Scandlines ferry M/V Prinsesse Benedikte is being repaired at the Polish shipyard Remontowa and is expected to be ready before the end of June 2015.

Washington State Ferry Tacoma Returns to Service

Washington State Ferry M/V Tacoma will return to work on the Seattle/Bainbridge Island route starting March 28 after suffering electrical damage last summer.   The

Greek Ferry Still Stuck

The Greek ferry that ran aground just outside of port on the Aegean Island of Kassos Wednesday night is still stuck. The 227 passengers and 55 crew aboard the

 
 
Maritime Careers / Shipboard Positions Maritime Security Maritime Standards Naval Architecture Offshore Oil Pipelines Salvage Ship Simulators Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.2496 sec (4 req/sec)