Second JHSV Completes Builder's Trials

Press Release
Thursday, March 14, 2013

Joint High Speed Vessel (JHSV) 2, the future 'USNS Choctaw County', successfully comes through Austal USA's sea trials.

Builder's trials are a significant step in the construction and delivery of a ship to the fleet and are the first opportunity to operate the ship underway and test overall system performance prior to demonstration to the Navy's Board of Inspection and Survey (INSURV).



"JHSV 2 is the second ship in this class to go through rigorous builder's trials testing," said Strategic and Theater Sealift Program Manager Capt. Henry Stevens. "At this stage, JHSV 2 is more complete than the lead ship, and we are benefitting from JHSV 1's lessons learned. This was the first step in preparing the ship for acceptance trials and delivery later this year." 



Trials included operating the ship's propulsion plant for many hours at different power levels, up to full power; testing and calibration of communication and navigational systems; ride control systems testing; and pollution control systems tests. Maneuverability trials tested the ship's four steerable water jets while a series of high-speed turns demonstrated the stability and agility of JHSV's catamaran hull form. The ship reached speeds of more than 41 knots.



Next, Austal will complete any required corrective actions required in preparation for acceptance trials, planned in the coming weeks. Choctaw County is expected to deliver to the Navy this summer.

JHSVs are versatile, non-combatant, transport ships used for fast intra-theater transportation of troops, military vehicles, and equipment. They are designed to commercial standards, with limited modifications for military use. The vessel is capable of transporting 600 short tons 1,200 nautical miles at an average speed of 35 knots and can operate in shallow-draft ports and waterways, interfacing with roll-on/roll-off discharge facilities, and on/off-loading a combat-loaded Abrams Main Battle Tank (M1A2). 

Other joint requirements include an aviation flight deck to support day and night aircraft launch and recovery operations. JHSV 2 will have airline style seating for 312 embarked forces with fixed berthing for 104. 


Email AddThis Feed Button
Maritime Reporter May 2013 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

Keel Authenticated for Ingalls’ Fifth National Security Cutter

Huntington Ingalls Industries' (HII) Ingalls Shipbuilding division authenticated the keel of the company's fifth U.S. Coast Guard National Security Cutter, James (WMSL 754).

USCG Contracts HII to Build Sixth National Security Cutter

The U.S. Coast Guard awarded a fixed‐price incentive firm target contract valued at approximately $487.1 million to Huntington Ingalls Industries for the production

Conrad Shipyards Earn Two Safety Awards

Conrad Shipyard, L.L.C. has received the 2012 Award for Excellence in Safety as well as the Award for improvement in Safety by the Shipbuilders Council of America (SCA).

Navy

Today in U.S. Naval history: May 17

Today in U.S. Naval history - May 17 1940 - FDR announces plans to recommission 35 more destroyers 1942 - USS Tautog (SS-199) sinks Japanese sub, I-28; while

High Power Phased Array Radar Development

The Australian Department of Defense released a request for tender to CEA Technologies for the development of a High Power Phased Array Radar concept demonstrator.

Kraken Completes U.S. Navy Sonar Trials

Kraken Sonar Systems Inc. announced that its Cooperative Research and Development Agreement (CRADA) with the U.S. Navy’s Naval Undersea Warfare Center (NUWC) in Newport, Rhode Island was successful.

 
 
mobi | rss feeds | archive | history | articles | privacy | contributors | top news | about us | copyright